Permit VOIDED | 4/18/2019 | 4/18/2019 | 4/18/2019 | | DONE |
Brittany Hill
|
|
|
cancel permit per Cam Hess. see email in documents
|
INSP-Final Inspection | 4/12/2019 | 4/16/2019 | 4/16/2019 | A | CANC |
Troy Cobbley
|
|
|
I can not find where cover, hydro or a flush has been performed for this scope of work.
Jim Baker is the contact for this final inspection. We are trying to coordinate with Crane Alarm. We are hoping for a 12:30 time slot. Thank you for your help. Phone #: ###-#### Inspection requested via web by Stan Beus
|
INSP-Final Inspection | 4/12/2019 | 4/15/2019 | 4/12/2019 | A | CANC |
Jim Page
|
|
|
Jim Baker is the contact for this inspection. We are trying to coordinate with Crane Alarm. We are hoping for a 12:30 time slot? Thank you for your help. Phone #: ###-#### >> Inspection requested via web by Stan Beus Inspection cancelled from web by: Stan Beus
|
CHANGE STATUS TO (ISS) | | | 4/10/2019 | | DONE |
|
|
|
plan mod cancelled per request from contractor, see attached document
|
Plan assigned to (Stumbaugh) | 3/12/2019 | | 3/21/2019 | | DONE |
Mark Stumbaugh
|
|
|
|
Plan Modification Accepted | | | 3/12/2019 | | DONE |
|
|
|
per Mark Stumbaugh, start plan mod
|
Plan resubmittals received | | | 7/25/2018 | | DONE |
|
|
|
|
Sprinkler Plan Check | 7/25/2018 | | 7/25/2018 | | PASS |
Tim Frost
|
|
|
|
Plan assigned to (Tim) | 7/25/2018 | | 7/25/2018 | | DONE |
Tim Frost
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 7/25/2018 | | DONE |
Tim Frost
|
|
|
|
Permit Ready to Issue | | | 7/25/2018 | | DONE |
|
|
|
|
Issue and Print Permit | | | 7/25/2018 | | DONE |
|
|
|
|
Intake Approval | | | 7/16/2018 | | PASS |
|
|
|
|
Plan assigned to (Tim) | 7/16/2018 | | 7/16/2018 | | DONE |
Tim Frost
|
|
|
|
Application received | | | 7/13/2018 | | DONE |
|
|
|
Application submitted via PDS Online on Jul 13 2018 9:54PM
|