INSP-Final Inspection | 11/20/2018 | 11/21/2018 | 11/21/2018 | A | PASS |
Troy Cobbley
|
|
|
permit finaled
Colton Phone #: ###-####
|
INSP-Final Inspection | 11/15/2018 | 11/16/2018 | 11/16/2018 | A | PART |
Troy Cobbley
|
|
|
A temporary for this permit is ok with Ron's permission until the weather proof backbox is installed. All other items are ok.
Coltin Phone #: ###-####
|
INSP-Final Inspection | 11/14/2018 | 11/15/2018 | 11/15/2018 | A | FAIL |
Troy Cobbley
|
|
|
As-builts are needed showing the additional devices as per the engineered plans and field conditions. A weather proof back box is needed in the basement shower. The NAC panel has been relocated to the ground floor. The FACP in the end of line calculations is not the panel installed. No actual testing performed.
Coltin Phone #: ###-####
|
Issue and Print Permit | | | 7/19/2018 | | DONE |
|
|
|
|
Plan assigned to (Lee) | 7/17/2018 | | 7/18/2018 | | DONE |
Lee G Meredith
|
|
|
|
1st review completed | | | 7/18/2018 | | PASS |
|
|
|
|
Alarm Plan Check | 7/17/2018 | | 7/18/2018 | | PASS |
Lee G Meredith
|
|
|
|
PLANS TAKEN FRONT DESK ALARM | | | 7/18/2018 | | DONE |
|
|
|
Plans approved with review comments and drawing notes.
|
Permit Ready to Issue | | | 7/18/2018 | | DONE |
|
|
|
|
Application received | | | 7/17/2018 | | DONE |
|
|
|
Application submitted via PDS Online on Jul 17 2018 10:57AM
|