Information based on query as of Thursday, July 4, 2024.
Permit Information
Permit NumberFIR18-00563
StatusFinaled
Name SHILO AUTOMATIC SPRINKLER CO
Site Address 2015 S HUDSON AVE
Project NameSkyline Apartments Bldg E
Customer NumberUDG ONLY
ePlanReviewYes
Description
[Skyline Apartments Building E - Udg Only] - Quick Permit
Install a new 2" x 61' ± CPVC line into the Apartment Bldg. This is only for the underground line. A full fire sprinkler submittal will follow at a later date.

[BLD17-04627]
The NFPA 13-R fire sprinkler system is used for occupancy and for story increase. To construct a 25,320 square foot three story VB Type of Construction apartment building (8,458 sq. ft. 1st story and 8,431 sq. ft. 2nd story and 8,431 sq. ft. 3rd story). Each unit is 1 story. Work is to include concrete footings, concrete foundations, concrete slabs on grade, wood stud bearing walls, wood stud shear walls, fiberglass shingles, 1-hr dwelling unit separations, 1 hour fire barriers for stair and breezeways, rated doors in breezeway, interior nonbearing walls, millwork, and finishes. Special Inspection is NOT required. The roof truss design is a deferred submittal item. The work is required to comply with the approved drawings, with the plan review report, and with all applicable codes and ordinances. The fire sprinkler system is required to comply with NFPA 13-R as regulated by the Fire Department. Separate fire sprinkler permits shall be obtained prior to beginning any modification or installation work on such systems. **ajs**192 unit apartment project with (9) apartment buildings, clubhouse, and associated site work
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
INSP-Final Inspection3/28/20193/28/20193/28/2019PPASS
DetailsJim Page
Final inspection for underground supply complete.

Gerardo Arce is the contact. This inspection has already been done, reach out to the contact for more information. Thank you for your hard work! Phone #: ###-#### Inspection requested via web by Stan Beus
INSP-Sprinkler Rough-in/Hydro3/5/20193/6/20193/6/2019ADONE
DetailsJim Page
Hydrostatic test for undergorund supply witnessed, no pressure loss observed.

This is for an underground hydro only. Gabe Garduno is the contact. Thank you for your hard work! Phone #: ###-#### Inspection requested via web by Stan Beus
INSP-Supply line flush3/4/20193/5/20193/5/2019ADONE
DetailsJim Page
Underground main line flush complete.

Gabe Garduno is the contact. This is inspection is for an flush and hydro. Thank you! Phone #: ###-#### Inspection requested via web by Stan Beus
INSP-Supply line flush11/8/201811/13/201811/13/2018PCANC
DetailsTroy Cobbley
Problem with hydro pump

Phone #: ###-#### Inspection requested via web by Stan Beus
INSP-Sprinkler Rough-in/Hydro11/8/201811/13/201811/13/2018PCANC
DetailsTroy Cobbley
Problem with hydro pump

Phone #: ###-#### Inspection requested via web by Stan Beus
INSP-Sprinkler Rough-in10/29/201810/30/201810/30/2018APASS
DetailsJim Page
Rough to cover inspection for underground supply complete, approved for cover.

Phone #: ###-#### Inspection requested via web by Stan Beus
INSP-Sprinkler Rough-in7/20/20187/20/20187/20/2018PFAIL
DetailsJim Page
Piping not in place at time of inspection, inspection request will need to rescheduled, piping cannot be covered.

underground-Brian Phone #: ###-####
Intake Approval  7/18/2018 PASS
Plan assigned to (Tim)7/18/2018 7/18/2018 DONE
DetailsTim Frost
PLANS/APPL TAKEN TO FRONT DESK  7/18/2018 DONE
DetailsTim Frost
Permit Ready to Issue  7/18/2018 DONE
Issue and Print Permit  7/18/2018 DONE
Application received  7/17/2018 DONE
Application submitted via PDS Online on Jul 17 2018 4:19PM
Sprinkler Plan Check7/18/2018