Permit Information
Permit NumberFIR18-00571
StatusFinaled
Name TREASURE VALLEY FIRE PROTECTION
Site Address 10259 W EMERALD ST Unit: 160
Project NameBASELINE TI
Customer Number 
ePlanReviewYes
Description
[Baseline TI - Unit #160] - Quick Permit
RELOCATE 28 HEADS OFF OF EXISTING 1 1/4" GRID LINES THROUGHOUT THE TI SPACE PER NFPA 13 2016 FOR LIGHT AND ORDINARY HAZARD.


[BLD18-01996]
Permit is to remodel an existing 19,560 sq. ft. tenant space by combining a 3,778 sq. ft. portion of the adjacent space to create a total of 23,338 sq. ft. business/manufacturing tenant space. Approval contingent upon adhering to the approved plans on file. Work to include: removal of select interior nonbearing walls, removal of select door/door frames, select wall infill, select new interior nonbearing walls to create a storage room, open office area, a conference room, (3) offices and a tenant demising wall, select new door/door frames, select new suspended acoustic ceiling, light fixtures, electrical work, mechanical work and interior finishes in compliance with Ch. 8 of the 2012 IBC. This building is fully Fire Sprinklered. Any alterations or modifications to the buildings Fire Sprinkler or Fire Alarm system WILL REQUIRE A SEPARATE PERMIT and shall be installed per NFPA 13 & NFPA 72 as regulated by the Boise Fire Department. **JG**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
INSP-Final Inspection8/20/20188/21/20188/21/2018APASS
DetailsJim Page
Final fire sprinkler inspection for area of work complete.

RIck Phone #: ###-####
INSP-Sprinkler Rough-in8/13/20188/13/20188/13/2018PPASS
DetailsTroy Cobbley
Rough-in passed. piping can be covered

Rick Phone #: ###-####
INSP-Sprinkler Rough-in/Hydro8/1/20188/2/20188/2/2018APASS
DetailsTroy Cobbley
See the city approved plans for location where rough-in passed and piping can be covered.

Mike Phone #: ###-####
Application received  7/19/2018 DONE
Application submitted via PDS Online on Jul 19 2018 8:37AM
Intake Approval  7/19/2018 PASS
Sprinkler Plan Check7/19/2018 7/19/2018 PASS
DetailsTim Frost
Plan assigned to (Tim)7/19/2018 7/19/2018 DONE
DetailsTim Frost
1st review completed  7/19/2018 PASS
DetailsTim Frost
PLANS/APPL TAKEN TO FRONT DESK  7/19/2018 DONE
DetailsTim Frost
Issue and Print Permit  7/19/2018 DONE
Permit Ready to Issue  7/19/2018 DONE
CHANGE STATUS TO (ISS)  7/19/2018 DONE