DOC - Permit Finaled | | | 11/20/2018 | | DONE |
|
|
|
as per Tim Frot final passed-doc final
|
INSP-Final Inspection | 11/13/2018 | 11/14/2018 | 11/14/2018 | A | PASS |
Tim Frost
|
|
|
Final OK
Phone #: ###-#### >> Inspection requested via web by Stan Beus
|
INSP-Final Inspection | 11/12/2018 | 11/13/2018 | 11/13/2018 | A | FAIL |
Tim Frost
|
|
|
- Could not ring bell.
- Sign on riser room door.
- Hanger on riser.
Phone #: ###-#### >> Inspection requested via web by Stan Beus
|
INSP-Final Inspection | 11/2/2018 | 11/8/2018 | 11/8/2018 | P | FAIL |
Jim Page
|
|
|
Add fire sprinkler head to get proper floor coverage due to added duct. Irrigation timer is not installed, need to test irrigation shutdown with flow switch activation.
Colton Cox is the contact for this final inspection. Thank you for your help. Have a nice day. Phone #: ###-#### Inspection requested via web by Stan Beus
|
INSP-Sprinkler Rough-in/Hydro | 11/8/2018 | 11/8/2018 | 11/8/2018 | P | DONE |
Jim Page
|
|
|
Hydrostatic completed and witnessed with city pressure (system does not have FDC so static pressure for hydro is allowed), no pressure loss observed.
|
INSP-Sprinkler Rough-in | 9/27/2018 | 9/27/2018 | 9/27/2018 | P | PASS |
Jim Page
|
|
|
Tenting inspection complete, overhead fire sprinkler piping approved for cover.
Tinting needs to be completed. Phone #: ###-#### Inspection requested via web by Stan Beus
|
INSP-Sprinkler Rough-in | 9/14/2018 | 9/17/2018 | 9/18/2018 | P | PASS |
Jim Page
|
|
|
Phone #: ###-#### >> Inspection requested via web by Stan Beus
____________
Passed
|
INSP-Sprinkler Rough-in | 9/14/2018 | 9/17/2018 | 9/14/2018 | A | CANC |
Jim Page
|
|
|
Phone #: ###-#### >> Inspection requested via web by Stan Beus Inspection cancelled from web by: Stan Beus
|
Plan resubmittals received | | | 7/27/2018 | | DONE |
|
|
|
|
Sprinkler Plan Check | 7/27/2018 | | 7/27/2018 | | PASS |
Tim Frost
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 7/27/2018 | | DONE |
Tim Frost
|
|
|
|
Permit Ready to Issue | | | 7/27/2018 | | DONE |
|
|
|
|
Issue and Print Permit | | | 7/27/2018 | | DONE |
|
|
|
|
Intake Approval | | | 7/26/2018 | | PASS |
|
|
|
|
Plan assigned to (Tim) | 7/26/2018 | | 7/26/2018 | | DONE |
Tim Frost
|
|
|
|
Sprinkler Plan Check | 7/26/2018 | | 7/26/2018 | | FAIL |
Tim Frost
|
|
|
|
1st review completed | | | 7/26/2018 | | PASS |
Tim Frost
|
|
|
|
Miscellaneous action | | | 7/26/2018 | | DONE |
Tim Frost
|
|
|
Emailed contractor in regards to failed review.
|
Application received | | | 7/24/2018 | | DONE |
|
|
|
Application submitted via PDS Online on Jul 24 2018 6:13PM
|