INSP-Final Inspection | 2/7/2019 | 2/7/2019 | 2/7/2019 | P | PASS |
Jim Page
|
|
|
Plans mods have been approved, final fire alarm inspection for area of work complete.
Phone #: ###-#### Inspection requested via web by david davis
|
Permit Ready to Issue | | | 2/7/2019 | | DONE |
|
|
|
plan mod
|
CHANGE STATUS TO (ISS) | | | 2/7/2019 | | DONE |
|
|
|
|
Plan Modification Accepted | | | 1/25/2019 | | DONE |
|
|
|
Notification layout changed.
|
Alarm Plan Check | 1/25/2019 | | 1/25/2019 | | PASS |
Lee G Meredith
|
|
|
|
PLANS TAKEN FRONT DESK ALARM | | | 1/25/2019 | | DONE |
|
|
|
Plan mod approved. On site review so no drawings or documents.
|
INSP-Final Inspection | 1/8/2019 | 1/9/2019 | 1/9/2019 | A | PART |
Jim Page
|
|
|
Changes needed to be made for wall layout, a plan mod will be submitted for corrections. Function test performed, all worked correctly. Once plan mod is complete then permit for scope of work can be completed.
Please call half hour before arriving. Thanks Phone #: ###-#### Inspection requested via web by david davis
|
INSP-Final Inspection | 9/12/2018 | 9/13/2018 | 9/13/2018 | A | CANC |
Jim Page
|
|
|
Please call 1/2 hour before arriving. Thanks Phone #: ###-#### >> Inspection requested via web by david davis Inspection cancelled from web by: david davis
|
Permit Ready to Issue | | | 8/10/2018 | | DONE |
|
|
|
|
Issue and Print Permit | | | 8/10/2018 | | DONE |
|
|
|
|
1st review completed | | | 8/10/2018 | | PASS |
|
|
|
|
Alarm Plan Check | 8/9/2018 | | 8/9/2018 | | PASS |
Lee G Meredith
|
|
|
|
PLANS TAKEN FRONT DESK ALARM | | | 8/9/2018 | | DONE |
|
|
|
On site plan review approved.
|
Plan assigned to (Lee) | 8/9/2018 | | 8/9/2018 | | DONE |
Lee G Meredith
|
|
|
|
Application received | | | 8/3/2018 | | DONE |
Lee G Meredith
|
|
|
This permit was created on the web by Paul Marcolina
|
Application received | | | 8/3/2018 | | DONE |
|
|
|
This permit was created on the web by Paul Marcolina
|