Information based on query as of Friday, August 16, 2024.
Permit Information
Permit NumberFIR18-00616
StatusFinaled
Name THORPE FIRE SPRINKLER SYSTEMS
Site Address 1897 S WINDSTAR PL
Project NameBOULDER HEIGHTS LOT 10
Customer Number 
ePlanReviewYes
Description
[Nelson Residence - Boulder Heights Lot 10]
The fire sprinkler scope of work consists of a new single family three level home. The system is designed as a passive purge system. The system utilizes CPVC piping and residential type sprinklers.
[BLD18-01993]
***Prescriptive component energy approach*** WUI Zone A requirements*** Permit for the construction of a new 4533 sq. ft., three story (first story 2507 sq. ft., second story 777 sq. ft., basement 1249) single family dwelling with 4 bedrooms, 3.5 bathrooms, approximately 480 sq. ft. of covered patio/porch and a 1009 sq. ft. attached garage per the approved plans, plan review report and any notations. R-1A/DA zoning and setbacks per planning. MDH

Alternative Materials and Methods:
This project includes approved code alternates to the following fire protection systems and/or building life safety systems. Please review the supplemental documents attached to this building permit case for details. Fire protection “shop drawings” shall include approved code alternate design.

• There are no AMM at this time
Plan Mod 2/5/2019 Approved **MAS**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
INSP-Final Inspection2/21/20192/22/20192/22/2019PPASS
DetailsJim Page
Final fire sprinkler inspection complete.

Please call Anthony before heading out, thanks! Phone #: ###-#### Inspection requested via web by Anthony Minichiello
Plan assigned to (Stumbaugh)2/4/2019 2/5/2019 DONE
DetailsMark Stumbaugh
Sprinkler Plan Check2/5/2019 2/5/2019 PASS
DetailsMark Stumbaugh
PLANS/APPL TAKEN TO FRONT DESK  2/5/2019 DONE
DetailsMark Stumbaugh
No Fee
Permit Ready to Issue  2/5/2019 DONE
plan mod approved
CHANGE STATUS TO (ISS)  2/5/2019 DONE
Plan Modification Accepted  2/4/2019 DONE
Adding a double check backflow device. Eplan workflow started.
INSP-Sprinkler Rough-in11/29/201811/29/201811/29/2018PPASS
DetailsJim Page
Tenting has been repaired, all tenting in place at time of inspection, overhead fire sprinkler piping approved for cover.

Tenting inspection Phone #: ###-#### Inspection requested via web by Anthony Minichiello
INSP-Sprinkler Rough-in11/28/201811/28/201811/28/2018AFAIL
DetailsJim Page
Insulation has fallen off of piping in numerous areas throughout, tenting needs to be corrected and in place before cover can be approved.
INSP-Sprinkler Rough-in/Hydro11/27/201811/28/201811/28/2018ADONE
DetailsJim Page
Hydrostatic test witnessed with city pressure (No FDC so static pressure from city utility for hydro). No pressure loss observed.

Rough Hydro and Tenting. Please call when you are heading out, thank you! Phone #: ###-#### Inspection requested via web by Anthony Minichiello
INSP-Sprinkler Rough-in11/14/201811/14/201811/14/2018PPART
DetailsTim Frost
All was ok except missing the sprinkler in the pantry.
The underground was not connected to the riser yet.


Call Anthony before heading out, thanks! Phone #: ###-#### >> Inspection requested via web by Anthony Minichiello
Issue and Print Permit  9/13/2018 DONE
Intake Approval  8/9/2018 PASS
Plan assigned to (Tim)8/9/2018 8/9/2018 DONE
DetailsTim Frost
Sprinkler Plan Check8/9/2018 8/9/2018 PASS
DetailsTim Frost
Please, see attached comments.
1st review completed  8/9/2018 PASS
DetailsTim Frost
PLANS/APPL TAKEN TO FRONT DESK  8/9/2018 DONE
DetailsTim Frost
Permit Ready to Issue  8/9/2018  
Application received  8/6/2018 DONE
Application submitted via PDS Online on Aug 6 2018 2:54PM