INSP-Final Inspection | 1/2/2019 | 1/4/2019 | 1/4/2019 | A | PASS |
Troy Cobbley
|
|
|
Permit finaled
John Howard, Technician Phone #: ###-#### Inspection requested via web by John Siewert
|
INSP-Final Inspection | 12/20/2018 | 12/21/2018 | 12/21/2018 | A | FAIL |
Jim Page
|
|
|
Flow switch did not operate with water flow, FDC bell stopped when panel was silenced, did not continue to ring with flow switch being held, FDC bell needs to ring during water flow.
John Howard, Technician Phone #: ###-#### Inspection requested via web by John Siewert
|
Application received | | | 8/9/2018 | | DONE |
|
|
|
Application submitted via PDS Online on Aug 9 2018 8:52AM
|
Plan assigned to (Lee) | 8/9/2018 | | 8/9/2018 | | DONE |
Lee G Meredith
|
|
|
|
1st review completed | | | 8/9/2018 | | PASS |
|
|
|
|
Alarm Plan Check | 8/9/2018 | | 8/9/2018 | | PASS |
Lee G Meredith
|
|
|
|
PLANS TAKEN FRONT DESK ALARM | | | 8/9/2018 | | DONE |
|
|
|
Plans approved with review comments.
|
Permit Ready to Issue | | | 8/9/2018 | | DONE |
|
|
|
|
Issue and Print Permit | | | 8/9/2018 | | DONE |
|
|
|
|