INSP-Final Inspection | 11/26/2018 | 11/27/2018 | 11/27/2018 | A | PASS |
Jim Page
|
|
|
Previously noted items have been corrected, final fire sprinkler inspection complete.
Johnathon Phone #: ###-####
|
INSP-Sprinkler Rough-in | 11/19/2018 | 11/20/2018 | 11/20/2018 | A | FAIL |
Jim Page
|
|
|
One head in main entry and one head in corridor between bedrooms are less than 4 inches off of wall, heads need to be relocated to be 4 inches or more from walls. Fire bell needs to be relocated to be seen from the address side of street. Need to perform hydrostatic test at city static pressure before final inspection can be completed.
John-overhead Phone #: ###-####
|
INSP-Sprinkler Rough-in | 9/4/2018 | 9/4/2018 | 9/4/2018 | P | PASS |
Jim Page
|
|
|
Rough to cover inspection for overhead fire sprinkler piping/tenting complete, approved for cover.
John Phone #: ###-####
|
Intake Approval | | | 8/16/2018 | | PASS |
|
|
|
|
Plan assigned to (Tim) | 8/16/2018 | | 8/16/2018 | | DONE |
Tim Frost
|
|
|
|
Sprinkler Plan Check | 8/16/2018 | | 8/16/2018 | | PASS |
Tim Frost
|
|
|
Please, see attached comments.
|
1st review completed | | | 8/16/2018 | | PASS |
Tim Frost
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 8/16/2018 | | DONE |
Tim Frost
|
|
|
|
Permit Ready to Issue | | | 8/16/2018 | | DONE |
|
|
|
|
Issue and Print Permit | | | 8/16/2018 | | DONE |
|
|
|
|
Application received | | | 8/14/2018 | | DONE |
|
|
|
Application submitted via PDS Online on Aug 14 2018 12:02PM
|