INSP-Final Inspection | 6/4/2019 | 6/4/2019 | 6/4/2019 | A | PASS |
Jim Page
|
|
|
Final fire alarm inspection complete.
Phone #: 2088301311 >> Inspection requested via mobile web by Nathan Price
|
Permit Ready to Issue | | | 1/25/2019 | | DONE |
|
|
|
Plan mod approved
|
CHANGE STATUS TO (ISS) | | | 1/25/2019 | | DONE |
|
|
|
|
Miscellaneous action | | | 1/23/2019 | | DONE |
|
|
|
Sheri requested the work flow be opened.
|
Plan Modification Accepted | | | 1/23/2019 | | DONE |
|
|
|
|
Alarm Plan Check | 1/23/2019 | | 1/23/2019 | | PASS |
Lee G Meredith
|
|
|
|
PLANS TAKEN FRONT DESK ALARM | | | 1/23/2019 | | DONE |
|
|
|
Plan mod approved. No additional review comments.
|
Issue and Print Permit | | | 8/27/2018 | | DONE |
|
|
|
|
Alarm Plan Check | 8/24/2018 | | 8/24/2018 | | PASS |
Lee G Meredith
|
|
|
|
PLANS TAKEN FRONT DESK ALARM | | | 8/24/2018 | | DONE |
|
|
|
Plans approved with review comments and requirements.
|
Permit Ready to Issue | | | 8/24/2018 | | DONE |
|
|
|
|
Plan assigned to (Lee) | 8/22/2018 | | 8/22/2018 | | DONE |
Lee G Meredith
|
|
|
|
1st review completed | | | 8/22/2018 | | DONE |
|
|
|
Failed pre-screen. Only part of the drawings were shown on the pages. Returned to Sheri for correction.
|
Application received | | | 8/21/2018 | | DONE |
|
|
|
Application submitted via PDS Online on Aug 21 2018 4:53PM
|