Information based on query as of Tuesday, July 16, 2024.
Permit Information
Permit NumberFIR18-00664
StatusFinaled
Name ALL VALLEY FIRE INSPECTIONS AND SER
Site Address 320 N MILWAUKEE ST
Project NameOlive Garden Boise
Customer Number 
ePlanReviewYes
Description
[Olive Garden Boise] - Quick Permit
Change sidewall in skylight to upright over pendant in new cloud ceiling. Add upright protection in new heated tower.

[BLD18-01707]
Permit is to remodel an existing 9,424 sq. ft. restaurant. (Architect of record has changed the construction type to VB). Approval is contingent upon adhering to the approved plans on file and plan review report. Work to include: removal of select walls, removal of select door/door frames, removal of select raised floor, removal of select decorative columns and arches, removal of select interior windows, removal of select millwork, removal of select interior awnings, removal and new select interior furnishings, removal of select exterior entry roof assembly, removal of select exterior entry awning, removal of select exterior entry roof overhang, construction of new entry tower with a canopy, select new tower footings, select new roof assembly, select new exterior entry stone veneer, construction of select interior non-bearing walls, select new wall infill, select new door/door frames, new accessible bar top area, millwork, select new ceiling soffits, select new suspended acoustic ceiling, select new light fixtures, electrical work, and interior finishes in compliance with Ch. 8 of the current IBC. Note: special inspection required; see attached form #310. This building is fully Fire Sprinklered. Any alterations or modifications to the buildings Fire Sprinkler or Fire Alarm system WILL REQUIRE A SEPARATE PERMIT and shall be installed per NFPA 13 & NFPA 72 as regulated by the Boise Fire Department. **JG**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
INSP-Final Inspection9/20/20189/21/20189/21/2018APASS
DetailsTroy Cobbley
Permit finaled

John Phone #: ###-####
INSP-Sprinkler Rough-in9/10/20189/10/20189/10/2018PPASS
DetailsTroy Cobbley
Forrest Inspection comments-
Scope of fire sprinkler permit work completed satisfactory. Rough-in inspection passed. Okay for final upon request.
Prints will be left with a worker // Cole Phone #: ###-####
Intake Approval  9/5/2018 PASS
Plan assigned to (Tim)9/5/2018 9/5/2018 DONE
DetailsTim Frost
Sprinkler Plan Check9/5/2018 9/5/2018 PASS
DetailsTim Frost
Please, see attached comments.
1st review completed  9/5/2018 PASS
DetailsTim Frost
PLANS/APPL TAKEN TO FRONT DESK  9/5/2018 DONE
DetailsTim Frost
Permit Ready to Issue  9/5/2018 DONE
Issue and Print Permit  9/5/2018 DONE
Application received  8/23/2018 DONE
Application submitted via PDS Online on Aug 23 2018 3:13PM