INSP-Final Inspection | 9/18/2018 | 9/18/2018 | 9/18/2018 | A | DONE |
Adele J Schaffeld-Griffin
|
|
|
final occured at same time as rough.
|
DOC - Permit Finaled | | | 9/18/2018 | | DONE |
Adele J Schaffeld-Griffin
|
|
|
|
INSP-Sprinkler Rough-in | 9/11/2018 | 9/11/2018 | 9/12/2018 | P | PASS |
Jim Page
|
|
|
rick fry Phone #: ###-#### >> Inspection requested via web by Brodie Stenquist
_____________
Rough in was ok.
|
Issue and Print Permit | | | 9/11/2018 | | DONE |
|
|
|
|
Intake Approval | | | 9/10/2018 | | PASS |
Tim Frost
|
|
|
|
Plan assigned to (Tim) | 9/10/2018 | | 9/10/2018 | | DONE |
Tim Frost
|
|
|
|
Sprinkler Plan Check | 9/10/2018 | | 9/10/2018 | | PASS |
Tim Frost
|
|
|
Please, see attached comments.
|
1st review completed | | | 9/10/2018 | | PASS |
Tim Frost
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 9/10/2018 | | DONE |
Tim Frost
|
|
|
|
Permit Ready to Issue | | | 9/10/2018 | | DONE |
|
|
|
|
Intake Approval | | | 8/29/2018 | | FAIL |
Adele J Schaffeld-Griffin
|
|
|
Please see submittal standards.
https://pds.cityofboise.org/media/457636/PDox86_BuildingApplicantGuide.pdf
https://pds.cityofboise.org/media/464072/pdox86_electronic_standards_full_050718.pdf
Documents need to be uploaded in the document folder
Plans need to be uploaded in the drawings folder
Sheet size and stamping areas need to be provided
All drawings must be uploaded individually.
|
Application received | | | 8/24/2018 | | DONE |
|
|
|
Application submitted via PDS Online on Aug 24 2018 1:29PM
|