INSP-Final Inspection | 12/6/2018 | 12/7/2018 | 12/7/2018 | A | PASS |
Troy Cobbley
|
|
|
Permit finaled.
Phone #: ###-#### Inspection requested via web by Stan Beus
|
Plan Modification Accepted | | | 11/28/2018 | | DONE |
Tim Frost
|
|
|
|
Plan assigned to (Tim) | 11/28/2018 | | 11/28/2018 | | DONE |
Tim Frost
|
|
|
|
Sprinkler Plan Check | 11/28/2018 | | 11/28/2018 | | PASS |
Tim Frost
|
|
|
Please, see attached comments.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 11/28/2018 | | DONE |
Tim Frost
|
|
|
|
Permit Ready to Issue | | | 11/28/2018 | | DONE |
|
|
|
Plan Mod
|
CHANGE STATUS TO (ISS) | | | 11/28/2018 | | DONE |
|
|
|
|
INSP-Sprinkler Rough-in/Hydro | 11/20/2018 | 11/21/2018 | 11/21/2018 | A | PASS |
Troy Cobbley
|
|
|
The piping above the lay in ceiling tile is ok for cover.. Need as-builts showing the below mezzanine pipe re-route
Todd Ketterling is the contact for this rough to cover inspection. Thank you for your help. Have a good day. Phone #: ###-#### Inspection requested via web by Stan Beus
|
INSP-Sprinkler Rough-in | 11/19/2018 | 11/20/2018 | 11/20/2018 | P | CANC |
Troy Cobbley
|
|
|
Not ready. To be rescheduled.
Todd Ketterling is the contact. Phone #: ###-#### Inspection requested via web by Stan Beus
|
INSP-Sprinkler Rough-in | 10/31/2018 | 11/1/2018 | 11/1/2018 | A | PASS |
Troy Cobbley
|
|
|
Rough-in passed. Piping can be covered.
Phone #: ###-#### Inspection requested via web by Stan Beus
|
Issue and Print Permit | | | 9/11/2018 | | DONE |
|
|
|
|
Plan resubmittals received | | | 9/10/2018 | | DONE |
Tim Frost
|
|
|
|
Plan assigned to (Tim) | 9/10/2018 | | 9/10/2018 | | DONE |
Tim Frost
|
|
|
|
Sprinkler Plan Check | 9/10/2018 | | 9/10/2018 | | PASS |
Tim Frost
|
|
|
Please, see attached comments.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 9/10/2018 | | DONE |
Tim Frost
|
|
|
|
Permit Ready to Issue | | | 9/10/2018 | | DONE |
|
|
|
|
Intake Approval | | | 9/5/2018 | | PASS |
Tim Frost
|
|
|
|
Plan assigned to (Tim) | 9/5/2018 | | 9/5/2018 | | DONE |
Tim Frost
|
|
|
|
Sprinkler Plan Check | 9/5/2018 | | 9/5/2018 | | FAIL |
Tim Frost
|
|
|
|
1st review completed | | | 9/5/2018 | | FAIL |
Tim Frost
|
|
|
|
Application received | | | 8/27/2018 | | DONE |
|
|
|
Application submitted via PDS Online on Aug 27 2018 11:18AM
|