INSP-Final Inspection | 2/6/2019 | 2/7/2019 | 2/7/2019 | P | PASS |
Jim Page
|
|
|
Final fire sprinkler inspection for area of work complete.
Adam Phone #: ###-####
|
INSP-Sprinkler Rough-in | 10/1/2018 | 10/2/2018 | 10/2/2018 | P | PASS |
Jim Page
|
|
|
Rough to cover inspection for overhead fire sprinkler piping in area of work complete, approved for cover. The fire sprinkler riser room will need to have an exterior door installed to a rated riser room or a wall mount post indicator valve will need to be installed to be code compliant before final inspection.
Rick Phone #: ###-####
|
Intake Approval | | | 9/6/2018 | | PASS |
Tim Frost
|
|
|
|
Plan assigned to (Tim) | 9/6/2018 | | 9/6/2018 | | DONE |
Tim Frost
|
|
|
|
Sprinkler Plan Check | 9/6/2018 | | 9/6/2018 | | PASS |
Tim Frost
|
|
|
Please, see attached comments.
|
1st review completed | | | 9/6/2018 | | PASS |
Tim Frost
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 9/6/2018 | | DONE |
Tim Frost
|
|
|
|
Permit Ready to Issue | | | 9/6/2018 | | DONE |
|
|
|
|
Issue and Print Permit | | | 9/6/2018 | | DONE |
|
|
|
|
Application received | | | 8/29/2018 | | DONE |
|
|
|
Application submitted via PDS Online on Aug 29 2018 11:50AM
|