INSP-Final Inspection | 10/1/2019 | 10/2/2019 | 10/2/2019 | A | PASS |
Troy Cobbley
|
|
|
Permit finaled
|
INSP-Sprinkler Rough-in/Hydro | 6/21/2019 | 6/24/2019 | 6/24/2019 | A | DONE |
Jim Page
|
|
|
Underground hydrostatic test witnessed, no pressure loss observed.
Gabe Garduno is the contact. Stacey is aware of this flush/hydro inspection, he will be there. Thank you for your hard work! Phone #: ###-#### Inspection requested via web by Stan Beus
|
INSP-Supply line flush | 6/21/2019 | 6/24/2019 | 6/24/2019 | A | DONE |
Jim Page
|
|
|
Underground main line flush complete.
Gabe Garduno is the contact. Stacey is aware of this flush/hydro inspection, he will be there. Thank you for your hard work! Phone #: ###-#### Inspection requested via web by Stan Beus
|
INSP-Sprinkler Rough-in/Hydro | 6/20/2019 | 6/21/2019 | 6/21/2019 | A | CANC |
Troy Cobbley
|
|
|
Cancel per Gabe Garduno
|
INSP-Supply line flush | 6/20/2019 | 6/21/2019 | 6/21/2019 | A | CANC |
Troy Cobbley
|
|
|
Cancel per Gabe Garduno
|
INSP-Sprinkler Rough-in | 3/26/2019 | 3/27/2019 | 3/27/2019 | A | PASS |
Troy Cobbley
|
|
|
The underground supply line piping is ok for cover including the 2" breeze way piping.
Cam Hess is the contact. Thank you for your hard work! Phone #: ###-#### Inspection requested via web by Stan Beus
|
Plan assigned to (Stumbaugh) | 3/20/2019 | | 3/21/2019 | | DONE |
Mark Stumbaugh
|
|
|
|
Sprinkler Plan Check | 3/21/2019 | | 3/21/2019 | | PASS |
Mark Stumbaugh
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 3/21/2019 | | DONE |
Mark Stumbaugh
|
|
|
No Fee
|
Permit Ready to Issue | | | 3/21/2019 | | DONE |
|
|
|
Plan Mod Approved
|
CHANGE STATUS TO (ISS) | | | 3/21/2019 | | DONE |
|
|
|
|
Plan Modification Accepted | | | 3/20/2019 | | DONE |
|
|
|
requested from Cam Hess
|
INSP-Sprinkler Rough-in | 2/7/2019 | 2/7/2019 | 2/7/2019 | P | PASS |
Jim Page
|
|
|
Rough to cover inspection for undergorund supply complete, approved for cover.
Call Jim Page to verify he witnessed pipe installation back in 2018. Shilo contact is Brian Collins. Thank you! Phone #: ###-#### Inspection requested via web by Stan Beus
|
Issue and Print Permit | | | 2/6/2019 | | DONE |
|
|
|
|
(F) Reprint permit | | | 2/6/2019 | | DONE |
|
|
|
|
Intake Approval | | | 9/6/2018 | | PASS |
Tim Frost
|
|
|
|
Plan assigned to (Tim) | 9/6/2018 | | 9/6/2018 | | DONE |
Tim Frost
|
|
|
|
Sprinkler Plan Check | 9/6/2018 | | 9/6/2018 | | PASS |
Tim Frost
|
|
|
Please, see attached comments.
|
1st review completed | | | 9/6/2018 | | PASS |
Tim Frost
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 9/6/2018 | | DONE |
Tim Frost
|
|
|
|
Permit Ready to Issue | | | 9/6/2018 | | DONE |
|
|
|
|
Application received | | | 9/5/2018 | | DONE |
|
|
|
Application submitted via PDS Online on Sep 5 2018 9:43PM
|