Information based on query as of Wednesday, July 24, 2024.
Permit Information
Permit NumberFIR18-00716
StatusFinaled
Name SHILO AUTOMATIC SPRINKLER CO
Site Address 2180 S HUDSON AVE
Project NameSkyline Apartments Bldg C
Customer Number 
ePlanReviewYes
Description
Shilo will install a new fire sprinkler system into the new apartment building per NFPA 13R, 2016, and the City of Boise.
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
INSP-Final Inspection5/9/20195/15/20195/15/2019APASS
DetailsJim Page
Previously noted item has been corrected, final fire sprinkler inspection is complete.

Austin Farnworth is the contact. Thank you for your hard work! Phone #: ###-#### Inspection requested via web by Stan Beus
INSP-Final Inspection5/1/20195/2/20195/2/2019PFAIL
DetailsTroy Cobbley
need the interconnections with the fire alarm tested. Need ceiling at the ground floor north apartment repaired. All other areas the work appears complete.


Gerardo Arce is the contact. Thank you for your hard work! Phone #: ###-#### Inspection requested via web by Stan Beus
Plan assigned to (Stumbaugh)4/18/2019 4/19/2019 DONE
DetailsMark Stumbaugh
Sprinkler Plan Check4/19/2019 4/19/2019 PASS
DetailsMark Stumbaugh
PLANS/APPL TAKEN TO FRONT DESK  4/19/2019 DONE
DetailsMark Stumbaugh
As Built Drawings - No Fee
Permit Ready to Issue  4/19/2019 DONE
as built approved- do not re issue
CHANGE STATUS TO (ISS)  4/19/2019 DONE
Plan resubmittals received  4/18/2019 DONE
Per Cam From Shilo Sprinklers start work flow for as built drawings.
INSP-Sprinkler Rough-in/Hydro12/11/201812/12/201812/12/2018ADONE
DetailsJim Page
Hydrostatic test for level 2 completed with anit-freeze, no pressure loss observed.

Gerarrdo is the contact and he would like a hydro on the 2nd floor. please. Phone #: ###-#### Inspection requested via web by Stan Beus
INSP-Sprinkler Rough-in/Hydro12/4/201812/4/201812/4/2018PPART
DetailsJim Page
Hydrostatic test for levels 1 and 3 witnessed, no pressure loss observed at riser gauges, hydro was completed with glycerine anitfreeze. Level 2 to be completed at a later date.

Gerarrdo is the contact. Phone #: ###-#### Inspection requested via web by Stan Beus
INSP-Sprinkler Rough-in12/4/201812/4/201812/4/2018APART
DetailsJim Page
Tenting inspection complete for level 3, level 3 overhead fire sprinkler piping approved for cover. Where piping crosses breezeway freeze protection will be required, rough in will not be signed off until freeze protection is inspected.
INSP-Sprinkler Rough-in11/27/201811/28/201811/28/2018APART
DetailsJim Page
Tenting inspection for overhead fire sprinkler piping on level 3, 2 north units complete, approved for cover, remaining units on level 3 still require tenting to be installed and inspected.

Gerarrdo is the contact. he would like a rough to cover on the 3rd floor. Phone #: ###-#### Inspection requested via web by Stan Beus
INSP-Sprinkler Rough-in11/21/201811/26/201811/26/2018AFAIL
DetailsJim Page
Cover material was installed before tenting inspection of fire sprinkler piping was complete, as noted before cover is not approved until tenting inspection is complete and passed, cover material installed needs to be removed on level 3 for tenting inspection to be performed correctly.

3rd floor and contact is Gerarrdo. Phone #: ###-#### Inspection requested via web by Stan Beus
INSP-Sprinkler Rough-in10/26/201810/29/201810/29/2018APART
DetailsJim Page
Rough to cover inspection for overhead fire sprinkler piping on levels 1 and 2 complete, levels 1 and 2 approvbed for cover. Rough in inspection for level 3 complete, tenting still needs to be installed, level 3 not approved for cover.

Phone #: ###-#### Inspection requested via web by Stan Beus
Issue and Print Permit  10/17/2018 DONE
Plan resubmittals received  9/26/2018 DONE
DetailsTim Frost
Plan assigned to (Tim)9/26/2018 9/26/2018 DONE
DetailsTim Frost
Sprinkler Plan Check9/26/2018 9/26/2018 PASS
DetailsTim Frost
Please, see attached comments.
PLANS/APPL TAKEN TO FRONT DESK  9/26/2018 DONE
DetailsTim Frost
Permit Ready to Issue  9/26/2018 DONE
All met
Intake Approval  9/19/2018 PASS
DetailsTim Frost
Plan assigned to (Tim)9/19/2018 9/19/2018 DONE
DetailsTim Frost
Sprinkler Plan Check9/19/2018 9/19/2018 FAIL
DetailsTim Frost
1st review completed  9/19/2018 FAIL
DetailsTim Frost
Miscellaneous action  9/19/2018 DONE
DetailsTim Frost
Emailed contractor in regards to failed review.
Application received  9/12/2018 DONE
Application submitted via PDS Online on Sep 12 2018 4:56PM