INSP-Final Inspection | 2/28/2019 | 3/1/2019 | 3/1/2019 | A | PASS |
Jim Page
|
|
|
Final fire alarm inspection to include as-builts complete.
Buck Phone #: ###-####
|
Miscellaneous action | | | 2/27/2019 | | DONE |
|
|
|
As builts received
|
CHANGE STATUS TO (ISS) | | | 2/27/2019 | | DONE |
|
|
|
as built, no fee per Lee
|
Miscellaneous action | | | 2/25/2019 | | DONE |
|
|
|
Rita requested the work flow be opened for as built upload.
|
INSP-Final Inspection | 1/31/2019 | 2/1/2019 | 2/1/2019 | A | PASS |
Jim Page
|
|
|
Previously noted items have been corrected, final fire alarm inspection complete.
Phone #: ###-#### Inspection requested via web by Ken Webster
|
INSP-Final Inspection | 1/21/2019 | 1/22/2019 | 1/22/2019 | A | FAIL |
Jim Page
|
|
|
Provide notification in areas as discussed. Pressure switch on dry system needs to be connected to FDC bell. Lower device in chapel area that is too high.
Plans will need to be resubmitted for areas that needs devices added and for areas where work was completed.
###-#### Ken Webster Phone #: ###-#### Inspection requested via web by Ken Webster
|
Issue and Print Permit | | | 9/18/2018 | | DONE |
|
|
|
|
Plan assigned to (Lee) | 9/14/2018 | | 9/14/2018 | | DONE |
Lee G Meredith
|
|
|
|
1st review completed | | | 9/14/2018 | | PASS |
|
|
|
|
Alarm Plan Check | 9/14/2018 | | 9/14/2018 | | PASS |
Lee G Meredith
|
|
|
|
PLANS TAKEN FRONT DESK ALARM | | | 9/14/2018 | | DONE |
|
|
|
Plans approved with review comments.
|
Permit Ready to Issue | | | 9/14/2018 | | DONE |
|
|
|
all requirements met
|
Application received | | | 9/12/2018 | | DONE |
|
|
|
Application submitted via PDS Online on Sep 12 2018 6:10PM
|