INSP-Final Inspection | 9/21/2018 | 9/24/2018 | 9/24/2018 | A | PASS |
Jim Page
|
|
|
Final fire alarm inspection for area of work complete.
Phone #: ###-#### Inspection requested via web by Ken Webster
|
Issue and Print Permit | | | 9/21/2018 | | DONE |
|
|
|
|
Plan assigned to (Lee) | 9/19/2018 | | 9/20/2018 | | DONE |
Lee G Meredith
|
|
|
|
1st review completed | | | 9/20/2018 | | PASS |
|
|
|
|
Alarm Plan Check | 9/20/2018 | | 9/20/2018 | | PASS |
Lee G Meredith
|
|
|
|
PLANS TAKEN FRONT DESK ALARM | | | 9/20/2018 | | DONE |
|
|
|
Plans approved with review comments.
|
Permit Ready to Issue | | | 9/20/2018 | | DONE |
|
|
|
|
Miscellaneous action | | | 9/19/2018 | | |
|
|
|
Tom Buck called to see if the inspection was to be done this morning was still scheduled. I informed Tom that an inspection had not been called in but that I would meet him there. Upon arrival, I found that a permit had not been issued yet, which explains why the inspection was not scheduled by Ken Webster. I informed Tom that work was not be performed without a permit and that I had not even received drawings for this project. No inspection done.
|
Application received | | | 9/13/2018 | | DONE |
|
|
|
Application submitted via PDS Online on Sep 13 2018 7:43PM
|