Case Summary | | | 5/1/2019 | | DONE |
|
|
|
|
INSP-Final Inspection | 1/3/2019 | 1/8/2019 | 1/8/2019 | A | PASS |
Jim Page
|
|
|
Previously noted items have been repaired, final fire alarm inspection complete.
7am inspection coordinated with Jim Paige Phone #: ###-#### Inspection requested via web by Shane Lesteberg
|
INSP-Final Inspection | 11/26/2018 | 11/29/2018 | 11/29/2018 | A | FAIL |
Jim Page
|
|
|
Remove old devices on levels 2 and 3. Repair audio visual devices on level 2. Repair strobe in parking garage that was going out of sync.
Rafe Phone #: ###-####
|
Plan assigned to (Lee) | 9/14/2018 | | 9/17/2018 | | DONE |
Lee G Meredith
|
|
|
|
1st review completed | | | 9/17/2018 | | PASS |
|
|
|
|
Alarm Plan Check | 9/14/2018 | | 9/17/2018 | | PASS |
Lee G Meredith
|
|
|
|
PLANS TAKEN FRONT DESK ALARM | | | 9/17/2018 | | DONE |
|
|
|
Plans approved with review comments. and requirements.
|
Permit Ready to Issue | | | 9/17/2018 | | DONE |
|
|
|
all requirements met
|
Issue and Print Permit | | | 9/17/2018 | | DONE |
|
|
|
|
Application received | | | 9/14/2018 | | DONE |
|
|
|
Application submitted via PDS Online on Sep 14 2018 3:46PM
|