INSP-Final Inspection | 1/15/2019 | 1/15/2019 | 1/15/2019 | P | PASS |
Jim Page
|
|
|
Final fire sprinkler inspection for area of work complete.
Phone #: ###-#### Inspection requested via web by Jeff Packham
|
INSP-Sprinkler Rough-in | 1/7/2019 | 1/8/2019 | 1/8/2019 | A | PASS |
Jim Page
|
|
|
Rough to cover inspection for overehad fire sprinkler piping in area of work complete, approved for cover.
Please call Randy if there are any questions. Thanks. Phone #: ###-#### Inspection requested via web by Jeff Packham
|
INSP-Final Inspection | 12/20/2018 | 12/21/2018 | 12/21/2018 | A | FAIL |
Jim Page
|
|
|
Ceiling tiles were installed before cover inspection was performed, only inspection for cover was on the hardlids, cover material for areas that have not been inspected needs to be removed for cover inspection to be performed.
Please call Lonnie with questions. Phone #: ###-#### Inspection requested via web by Jeff Packham
|
INSP-Sprinkler Rough-in | 9/26/2018 | 9/26/2018 | 9/26/2018 | A | PART |
Jim Page
|
|
|
Rough to cover inspection for overhead fire sprinkler piping located above hardlids complete, hardlids approved for cover.
Please call Lonnie with time frame. Phone #: ###-#### Inspection requested via web by Jeff Packham
|
Intake Approval | | | 9/19/2018 | | PASS |
Tim Frost
|
|
|
|
Plan assigned to (Tim) | 9/19/2018 | | 9/19/2018 | | DONE |
Tim Frost
|
|
|
|
Sprinkler Plan Check | 9/19/2018 | | 9/19/2018 | | PASS |
Tim Frost
|
|
|
Please, see attached comments.
|
1st review completed | | | 9/19/2018 | | PASS |
Tim Frost
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 9/19/2018 | | DONE |
Tim Frost
|
|
|
|
Permit Ready to Issue | | | 9/19/2018 | | DONE |
|
|
|
all requirements met
|
Issue and Print Permit | | | 9/19/2018 | | DONE |
|
|
|
|
Application received | | | 9/17/2018 | | DONE |
|
|
|
Application submitted via PDS Online on Sep 17 2018 10:49AM
|