Permit Ready to Issue | | | 6/13/2019 | | DONE |
|
|
|
As built approved
|
CHANGE STATUS TO (ISS) | | | 6/13/2019 | | DONE |
|
|
|
|
DOC - Permit Finaled | | | 6/13/2019 | | DONE |
|
|
|
Final acceptance test passed 6-6-19 and as builts approved 6-13-19.
|
Plan assigned to (Lee) | 6/6/2019 | | 6/12/2019 | | DONE |
Lee G Meredith
|
|
|
as built
|
1st review completed | | | 6/12/2019 | | PASS |
|
|
|
|
Alarm Plan Check | 6/12/2019 | | 6/12/2019 | | PASS |
Lee G Meredith
|
|
|
|
PLANS TAKEN FRONT DESK ALARM | | | 6/12/2019 | | DONE |
|
|
|
As built - No Fee
|
INSP-Final Inspection | 6/3/2019 | 6/4/2019 | 6/6/2019 | P | FAIL |
Troy Cobbley
|
|
|
Permit will be ok for final when as-builts are approved.
Ray McQueen, inspecting technician Phone #: ###-#### Inspection requested via web by Rose Peterson
|
Plan resubmittals received | | | 6/6/2019 | | DONE |
|
|
|
Rose Peterson from Mountain Alarm requested an as built open, per Lee.
|
1st review completed | | | 6/3/2019 | | PASS |
|
|
|
|
Alarm Plan Check | 6/3/2019 | | 6/3/2019 | | PASS |
Lee G Meredith
|
|
|
|
PLANS TAKEN FRONT DESK ALARM | | | 6/3/2019 | | DONE |
|
|
|
Passed. No additional review comments. As built drawings and product datat required prior to acceptance.
|
Permit Ready to Issue | | | 6/3/2019 | | DONE |
|
|
|
plan mod
|
CHANGE STATUS TO (ISS) | | | 6/3/2019 | | DONE |
|
|
|
|
Plan assigned to (Scharfen) | 5/17/2019 | | 5/28/2019 | | DONE |
Lee G Meredith
|
|
|
|
Miscellaneous action | | | 5/28/2019 | | DONE |
|
|
|
Emailed Rose to see if circuit isolation was included in the design for all circuits between buildings.
|
Plan Modification Accepted | | | 5/17/2019 | | DONE |
|
|
|
8601 red line changes and added pulse stations
|
INSP-Final Inspection | 3/26/2019 | 3/28/2019 | 3/28/2019 | A | FAIL |
Troy Cobbley
|
|
|
Resubmit plans that show entire scope of work that includes all devices in all buildings. Devices shall annunciate by the building address. Installation shall meet NFPA 72. Provide updated battery and notification circuit calculations. Separate remote annunciators maybe required for each building. Lightning protection may be required for circuits connecting each building. All buildings may require riser room pull stations. The horns on the exterior of the building may not be required.
Ray McQueen, inspecting technician Phone #: ###-#### Inspection requested via web by Rose Peterson
|
INSP-Final Inspection | 1/24/2019 | 1/30/2019 | 1/30/2019 | A | CANC |
Troy Cobbley
|
|
|
Cancel per Ray McQueen, inspecting technician Phone #: ###-#### Inspection requested via web by Rose Peterson
|
INSP-Final Inspection | 12/28/2018 | 1/4/2019 | 1/2/2019 | A | CANC |
Troy Cobbley
|
|
|
Ray McQueen, inspecting technician Phone #: ###-#### >> Inspection requested via web by Rose Peterson Inspection cancelled from web by: Rose Peterson
|
INSP-Final Inspection | 10/4/2018 | 10/9/2018 | 10/8/2018 | A | CANC |
Troy Cobbley
|
|
|
Ray McQueen, inspecting technician, building access is open Phone #: ###-#### >> Inspection requested via web by Rose Peterson Inspection cancelled from web by: Rose Peterson
|
Issue and Print Permit | | | 9/27/2018 | | DONE |
|
|
|
|
Plan assigned to (Lee) | 9/20/2018 | | 9/24/2018 | | DONE |
Lee G Meredith
|
|
|
|
1st review completed | | | 9/24/2018 | | PASS |
|
|
|
|
Alarm Plan Check | 9/20/2018 | | 9/24/2018 | | PASS |
Lee G Meredith
|
|
|
|
PLANS TAKEN FRONT DESK ALARM | | | 9/24/2018 | | DONE |
|
|
|
Plans approved with review comments and requirements.
|
Permit Ready to Issue | | | 9/24/2018 | | DONE |
|
|
|
met
|
Application received | | | 9/20/2018 | | DONE |
|
|
|
Application submitted via PDS Online on Sep 20 2018 1:29PM
|