INSP-Final Inspection | 1/29/2019 | 1/30/2019 | 1/30/2019 | P | PASS |
Troy Cobbley
|
|
|
Permit finaled.
Peter Naumov ###-####. Phone #: ###-#### Inspection requested via web by Cheyenne Zumstein
|
Miscellaneous action | | | 1/30/2019 | | DONE |
|
|
|
As built drawings and calcs reveived and accepted.
|
INSP-Final Inspection | 1/28/2019 | 1/28/2019 | 1/28/2019 | P | FAIL |
Troy Cobbley
|
|
|
Provide as-builts that show the candella changes and the different fire alarm panel. All devices tested except the duct smoke detectors. The first detector that I looked at is mounted incorrectly. Inspection stopped. All other devices tested and signals verified
|
Miscellaneous action | | | 1/23/2019 | | DONE |
|
|
|
As built drawings received.
|
Plan assigned to (Lee) | 9/22/2018 | | 9/24/2018 | | DONE |
Lee G Meredith
|
|
|
|
1st review completed | | | 9/24/2018 | | PASS |
|
|
|
|
Alarm Plan Check | 9/22/2018 | | 9/24/2018 | | PASS |
Lee G Meredith
|
|
|
|
PLANS TAKEN FRONT DESK ALARM | | | 9/24/2018 | | DONE |
|
|
|
Plans approved with review comments.
|
Permit Ready to Issue | | | 9/24/2018 | | DONE |
|
|
|
met
|
Issue and Print Permit | | | 9/24/2018 | | DONE |
|
|
|
|
Application received | | | 9/22/2018 | | DONE |
|
|
|
Application submitted via PDS Online on Sep 22 2018 5:22PM
|