INSP-Final Inspection | 12/9/2019 | 12/10/2019 | 12/10/2019 | A | PASS |
Jim Page
|
|
|
Final fire sprinkler inspection is complete.
Please call before heading out, thanks! Phone #: ###-#### Inspection requested via web by Anthony Minichiello
|
CHANGE STATUS TO (ISS) | | | 7/8/2019 | | DONE |
|
|
|
|
Plan assigned to (Stumbaugh) | 7/1/2019 | | 7/2/2019 | | DONE |
Mark Stumbaugh
|
|
|
|
Sprinkler Plan Check | 7/2/2019 | | 7/2/2019 | | PASS |
Mark Stumbaugh
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 7/2/2019 | | DONE |
Mark Stumbaugh
|
|
|
Plan Mod Fee $150.00
|
Permit Ready to Issue | | | 7/2/2019 | | DONE |
|
|
|
Plan Mod Approved
|
Plan Modification Accepted | | | 7/1/2019 | | DONE |
|
|
|
Per Alicia from Thorpe asked for the workflow to be opend for plan mod
|
INSP-Sprinkler Rough-in | 5/23/2019 | 5/23/2019 | 5/23/2019 | A | PART |
Jim Page
|
|
|
Rough to cover inspection for overhead fire sprinkler piping complete, changes were required outside of what was shown on the city approved drawings, as-builts will be submitted showing changes. Cover is approved at the contractors discretion, if changes need to be made due to as-builts not meeting requirements then cover material will need to be removed for corrections. Plastic sheeting used for tenting, all tenting in place at time of inspection.
|
INSP-Sprinkler Rough-in/Hydro | 5/22/2019 | 5/23/2019 | 5/23/2019 | A | DONE |
Jim Page
|
|
|
Hydrostatic test for overhead fire sprinkler piping witnessed at 140 psi (static pressure is required at a minimum, the hydro was completed with pressure above static city pressure), no pressure loss was observed.
Rough/hydro and tenting inspection. Please call James before heading out.
Thanks! Phone #: ###-#### Inspection requested via web by Anthony Minichiello
|
Plan assigned to (Stumbaugh) | 2/4/2019 | | 2/5/2019 | | DONE |
Mark Stumbaugh
|
|
|
|
Sprinkler Plan Check | 2/5/2019 | | 2/5/2019 | | PASS |
Mark Stumbaugh
|
|
|
Approved
|
PLANS/APPL TAKEN TO FRONT DESK | | | 2/5/2019 | | DONE |
Mark Stumbaugh
|
|
|
No Fee
|
Permit Ready to Issue | | | 2/5/2019 | | DONE |
|
|
|
plan mod approved
|
CHANGE STATUS TO (ISS) | | | 2/5/2019 | | DONE |
|
|
|
|
Plan Modification Accepted | | | 2/4/2019 | | DONE |
|
|
|
Adding a double check backflow device. Eplan workflow started
|
Issue and Print Permit | | | 10/1/2018 | | DONE |
|
|
|
|
Intake Approval | | | 9/27/2018 | | PASS |
Tim Frost
|
|
|
|
Plan assigned to (Tim) | 9/27/2018 | | 9/27/2018 | | DONE |
Tim Frost
|
|
|
|
Sprinkler Plan Check | 9/27/2018 | | 9/27/2018 | | PASS |
Tim Frost
|
|
|
Please, see attached comments.
|
1st review completed | | | 9/27/2018 | | PASS |
Tim Frost
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 9/27/2018 | | DONE |
Tim Frost
|
|
|
|
Permit Ready to Issue | | | 9/27/2018 | | DONE |
|
|
|
|
Application received | | | 9/26/2018 | | DONE |
|
|
|
Application submitted via PDS Online on Sep 26 2018 3:37PM
|