INSP-Final Inspection | 1/8/2019 | 1/8/2019 | 1/8/2019 | P | PASS |
Jim Page
|
|
|
Troubles on fire alarm panel have been repaired/cleared, final fire alarm inspection complete.
|
INSP-Final Inspection | 12/17/2018 | 12/18/2018 | 12/18/2018 | A | PART |
Jim Page
|
|
|
Final fire alarm inspection for area of work complete, panel was showing troubles outside the scope of work that need to be repaired, permit will not be finaled until troubles are resloved and panel is showing normal.
7 am owner request Phone #: ###-#### Inspection requested via web by Shane Lesteberg
|
INSP-Final Inspection | 12/17/2018 | 12/18/2018 | 12/17/2018 | A | CANC |
Jim Page
|
|
|
7am inspection requested by building owner Phone #: ###-#### >> Inspection requested via web by Shane Lesteberg Inspection cancelled from web by: Shane Lesteberg
|
Plan assigned to (Lee) | 9/27/2018 | | 9/28/2018 | | DONE |
Lee G Meredith
|
|
|
|
1st review completed | | | 9/28/2018 | | PASS |
|
|
|
|
Alarm Plan Check | 9/27/2018 | | 9/28/2018 | | PASS |
Lee G Meredith
|
|
|
|
PLANS TAKEN FRONT DESK ALARM | | | 9/28/2018 | | DONE |
|
|
|
Plans approved with review comments.
|
Permit Ready to Issue | | | 9/28/2018 | | DONE |
|
|
|
met
|
Issue and Print Permit | | | 9/28/2018 | | DONE |
|
|
|
|
Application received | | | 9/27/2018 | | DONE |
|
|
|
Application submitted via PDS Online on Sep 27 2018 3:30PM
|