INSP-Final Inspection | 8/22/2019 | 8/23/2019 | 8/23/2019 | A | CANC |
Troy Cobbley
|
|
|
I have not received confirmation that Alarmco has installed the antenna for the AES. Contact is Morgan. Phone #: ###-#### Inspection requested via web by Morgan Ahten
|
Plan assigned to (Lee) | 8/15/2019 | | 8/16/2019 | | DONE |
Lee G Meredith
|
|
|
as built
|
Alarm Plan Check | 8/16/2019 | | 8/16/2019 | | PASS |
Lee G Meredith
|
|
|
|
PLANS TAKEN FRONT DESK ALARM | | | 8/16/2019 | | DONE |
|
|
|
As built - No fee.
|
Permit Ready to Issue | | | 8/16/2019 | | DONE |
|
|
|
|
CHANGE STATUS TO (ISS) | | | 8/16/2019 | | DONE |
|
|
|
|
INSP-Final Inspection | 8/15/2019 | 8/15/2019 | 8/15/2019 | P | PART |
Mark Scharfen
|
|
|
Tested devices and signals. AES has low battery trouble. Verified sprinkler tie in, duct detector shutdown and notification in new school. OK for temp pending plan mod updating candella. Will need to test other fire alarm permit on existing school.
Contact is Dan. Phone #: ###-#### >> Inspection requested via web by Morgan Ahten
|
Plan resubmittals received | | | 8/15/2019 | | DONE |
|
|
|
as built request to open by Morgan
|
Plan assigned to (Lee) | 8/12/2019 | | 8/14/2019 | | DONE |
Lee G Meredith
|
|
|
|
Alarm Plan Check | 8/14/2019 | | 8/14/2019 | | PASS |
Lee G Meredith
|
|
|
|
PLANS TAKEN FRONT DESK ALARM | | | 8/14/2019 | | DONE |
|
|
|
As built - No fee.
|
Permit Ready to Issue | | | 8/14/2019 | | DONE |
|
|
|
|
CHANGE STATUS TO (ISS) | | | 8/14/2019 | | DONE |
|
|
|
|
Plan Modification Accepted | | | 8/12/2019 | | DONE |
|
|
|
as built requested by Morgan from Protex
|
INSP-Final Inspection | 8/9/2019 | 8/9/2019 | 8/9/2019 | P | FAIL |
Mark Scharfen
|
|
|
Tested panel functions. AES is at NETCON 0 per Alarmco CS. Tested trouble and alarm signal. Speaker in FACP room is horn, needs to be a speaker. Outside speaker strobe by bell needs to be a strobe only. No lift on site. AES zone wire is not shielded. Unable to verify gym devices.
Contact is Dan. Phone #: ###-#### Inspection requested via web by Morgan Ahten
|
INSP-Final Inspection | 8/8/2019 | 8/8/2019 | 8/8/2019 | P | CANC |
Troy Cobbley
|
|
|
Contact is Dirk. Phone #: ###-#### >> Inspection requested via web by Morgan Ahten Inspection cancelled from web by: Morgan Ahten
|
1st review completed | | | 10/10/2018 | | PASS |
|
|
|
|
Alarm Plan Check | 10/8/2018 | | 10/10/2018 | | PASS |
Lee G Meredith
|
|
|
|
PLANS TAKEN FRONT DESK ALARM | | | 10/10/2018 | | DONE |
|
|
|
Plans approved with review comments and requirements.
|
Permit Ready to Issue | | | 10/10/2018 | | DONE |
|
|
|
met
|
Issue and Print Permit | | | 10/10/2018 | | DONE |
|
|
|
|
Miscellaneous action | | | 10/8/2018 | | DONE |
|
|
|
Emailed Morgan to request that he add a scale graph to his drawing. Revised drawing received 10-9-18.
|
Application received | | | 10/1/2018 | | DONE |
|
|
|
Application submitted via PDS Online on Oct 1 2018 3:04PM
|