INSP-Final Inspection | 3/18/2019 | 3/19/2019 | 3/19/2019 | A | PASS |
Troy Cobbley
|
|
|
Permit finaled
Call for access- Matt Phone #: ###-####
|
INSP-Final Inspection | 3/13/2019 | 3/14/2019 | 3/14/2019 | A | FAIL |
Troy Cobbley
|
|
|
No approved drawings on site. The scope of work and the provided drawings did not match the actual work. Matt Phone #: ###-####
|
Issue and Print Permit | | | 2/26/2019 | | DONE |
|
|
|
|
(F) Reprint permit | | | 2/26/2019 | | DONE |
|
|
|
|
Plan resubmittals received | | | 2/19/2019 | | DONE |
|
|
|
|
Alarm Plan Check | 2/15/2019 | | 2/19/2019 | | PASS |
Lee G Meredith
|
|
|
|
PLANS TAKEN FRONT DESK ALARM | | | 2/19/2019 | | PASS |
|
|
|
Passed review
|
Permit Ready to Issue | | | 2/19/2019 | | DONE |
|
|
|
met
|
Alarm Plan Check | 12/12/2018 | | 12/12/2018 | | FAIL |
Lee G Meredith
|
|
|
None of the previous correction requirements have been made. Returned to applicant.
|
Plan resubmittals received | | | 12/11/2018 | | DONE |
|
|
|
|
1st review completed | | | 10/23/2018 | | FAIL |
|
|
|
Returned to applicant on failed pre-screen review. Wall heights need to be shown for the area where changes were made to insure strobe coverage is adequate. Also, scope of work on the drawings does not match that shown on the application. Requested applicant to make all corrections and resubmit.
|
Miscellaneous action | | | 10/23/2018 | | DONE |
|
|
|
Emailed Crystal Robertson to let her know the submittal has been returned for corrections. Also sent a link to the submittal requirements so she can make sure the drawings leave adequate space for drawing stamps.
|
Plan resubmittals received | | | 10/16/2018 | | DONE |
|
|
|
|
Miscellaneous action | | | 10/16/2018 | | DONE |
|
|
|
Emailed Crystal requesting additional information regarding wall heights in the area of relocated notification. Also asked for clarification on scope of work. Permit says relocation of a few notification devices. Drawing says panel replacement. She responded saying she will get answers to my questions.
|
Plan assigned to (Lee) | 10/4/2018 | | 10/5/2018 | | DONE |
Lee G Meredith
|
|
|
|
Miscellaneous action | | | 10/5/2018 | | DONE |
|
|
|
Emailed Crystal to request she add a scale graph to the drawing and to properly rotate the checklist.
|
Application received | | | 10/4/2018 | | DONE |
|
|
|
Application submitted via PDS Online on Oct 4 2018 8:38AM
|