INSP-Final Inspection | 10/29/2018 | 10/29/2018 | 10/29/2018 | P | PASS |
Jim Page
|
|
|
Final fire alarm inspection for area of work complete.
Shyann Phone #: ###-####
|
INSP-Final Inspection | 10/26/2018 | 10/29/2018 | 10/29/2018 | A | FAIL |
Jim Page
|
|
|
Called phone number provided two times between 0820 and 0845, received a messgae stated it was outside of normal business hours. Inspection request will need to be rescheduled.
Shyann Phone #: ###-####
|
Miscellaneous action | | | 10/26/2018 | | DONE |
|
|
|
Mary provided as built drawings with changes that include 2 added duct smoke detectors and 1 added kitchen hood monitoring point. Drawings are acceptable.
|
INSP-Final Inspection | 10/25/2018 | 10/25/2018 | 10/25/2018 | P | FAIL |
Jim Page
|
|
|
Troubleshoot HVAC unit for shutdown, HVAC unit did not shutdown with un-duct detector activation. Need city approved drawings, drawings provided did not have city stamp, plans did not show hood suppression system monitoring.
Shaine Phone #: ###-####
|
Plan assigned to (Lee) | 10/8/2018 | | 10/9/2018 | | DONE |
Lee G Meredith
|
|
|
|
1st review completed | | | 10/9/2018 | | PASS |
|
|
|
|
Alarm Plan Check | 10/8/2018 | | 10/9/2018 | | PASS |
Lee G Meredith
|
|
|
|
PLANS TAKEN FRONT DESK ALARM | | | 10/9/2018 | | DONE |
|
|
|
Quick permit approved. No review comments.
|
Permit Ready to Issue | | | 10/9/2018 | | DONE |
|
|
|
met
|
Issue and Print Permit | | | 10/9/2018 | | DONE |
|
|
|
|
Application received | | | 10/8/2018 | | DONE |
|
|
|
Application submitted via PDS Online on Oct 8 2018 5:02PM
|