INSP-Final Inspection | 7/3/2019 | 7/3/2019 | 7/3/2019 | P | PASS |
Troy Cobbley
|
|
|
Permit finaled
Phone #: 2088990672 >> Inspection requested via mobile web by Josiah
|
INSP-Alarm Testing | 6/17/2019 | 6/17/2019 | 6/17/2019 | P | DONE |
Troy Cobbley
|
|
|
The interconnections with the fire pump have been tested. For a final the interconnection with the elevator needs tested.
Phone #: 2088990672 >> Inspection requested via mobile web by Josiah
|
INSP-Sprinkler Rough-in/Hydro | 6/17/2019 | 6/17/2019 | 6/17/2019 | P | CANC |
Troy Cobbley
|
|
|
Phone #: 2088990672 >> Inspection requested via mobile web by Josiah Inspection cancelled via mobile web on Monday, June 17, 2019.
|
INSP-Alarm Testing | 6/14/2019 | 6/17/2019 | 6/17/2019 | A | CANC |
Troy Cobbley
|
|
|
Phone #: 2088990672 >> Inspection requested via mobile web by Josiah
|
INSP-Final Inspection | 6/14/2019 | 6/14/2019 | 6/14/2019 | P | CANC |
Troy Cobbley
|
|
|
Phone #: 2088990672 >> Inspection requested via mobile web by Josiah Inspection cancelled via mobile web on Friday, June 14, 2019.
|
INSP-Alarm Testing | 6/7/2019 | 6/7/2019 | 6/7/2019 | P | DONE |
Troy Cobbley
|
|
|
Need the interconnections with the fire sprinkler/fire pump devices tested, need elevator recall tested. Need duct smoke detectors tested. It appears the sync issue is actually an echo from the concrete floors and large open spaces. Phone #: 2088990672 >> Inspection requested via mobile web by Josiah
|
INSP-Alarm Testing | 6/6/2019 | 6/7/2019 | 6/7/2019 | A | CANC |
Troy Cobbley
|
|
|
Phone #: 2088990672 >> Inspection requested via mobile web by Josiah Inspection cancelled via mobile web on Friday, June 07, 2019.
|
INSP-Final Inspection | 6/6/2019 | 6/6/2019 | 6/6/2019 | P | FAIL |
Troy Cobbley
|
|
|
The fire alarm interconnection with the fire pump devices was not ready. We set off the notificatoin circuit and found that the audio portion is not syncing. Yesterdays correction noted have been addressed.
Phone #: 2088990672 >> Inspection requested via mobile web by Josiah
|
INSP-Alarm Testing | 6/6/2019 | 6/7/2019 | 6/6/2019 | P | CANC |
Troy Cobbley
|
|
|
Phone #: 2088990672 >> Inspection requested via mobile web by Josiah Inspection cancelled via mobile web on Thursday, June 06, 2019.
|
Permit Ready to Issue | | | 6/6/2019 | | DONE |
|
|
|
|
CHANGE STATUS TO (ISS) | | | 6/6/2019 | | DONE |
|
|
|
as built
|
Plan Modification Accepted | | | 6/5/2019 | | DONE |
|
|
|
as built
|
Plan assigned to (Lee) | 6/5/2019 | | 6/5/2019 | | DONE |
Lee G Meredith
|
|
|
as built
|
1st review completed | | | 6/5/2019 | | DONE |
|
|
|
|
Alarm Plan Check | 6/5/2019 | | 6/5/2019 | | DONE |
Lee G Meredith
|
|
|
|
PLANS TAKEN FRONT DESK ALARM | | | 6/5/2019 | | DONE |
|
|
|
As built - No Fee.
|
INSP-Alarm Testing | 6/3/2019 | 6/4/2019 | 6/4/2019 | P | DONE |
Troy Cobbley
|
|
|
Nathan and I did a walk through. I verified notification device placement and noted several areas where they need to be relocated and/or added. I also verified the FACP/NAC/Dialer model. No actual test could be performed due to the sprinkler system keeping the FACP busy with signals at this time. No elevator has been installed yet. As-builts will be required per our conversation prior to a final testing.
Phone #: 2088301311 >> Inspection requested via mobile web by Nathan Price
|
Plan assigned to (Lee) | 5/16/2019 | | 5/28/2019 | | DONE |
Lee G Meredith
|
|
|
|
1st review completed | | | 5/28/2019 | | PASS |
|
|
|
|
Alarm Plan Check | 5/28/2019 | | 5/28/2019 | | PASS |
Lee G Meredith
|
|
|
|
PLANS TAKEN FRONT DESK ALARM | | | 5/28/2019 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 5/28/2019 | | DONE |
|
|
|
plan mod
|
CHANGE STATUS TO (ISS) | | | 5/28/2019 | | DONE |
|
|
|
|
Plan Modification Accepted | | | 5/16/2019 | | DONE |
|
|
|
change location of panel
|
Issue and Print Permit | | | 10/29/2018 | | DONE |
|
|
|
|
Miscellaneous action | | | 10/29/2018 | | DONE |
|
|
|
Email received from Charlie Bayne noting that 75cd is allowed by NFPA up to 20 feet without derating. Not above 10 feet as noted on approved drawings.
|
Permit Ready to Issue | | | 10/26/2018 | | DONE |
|
|
|
all requirements met
|
1st review completed | | | 10/25/2018 | | PASS |
|
|
|
|
Alarm Plan Check | 10/23/2018 | | 10/25/2018 | | PASS |
Lee G Meredith
|
|
|
|
PLANS TAKEN FRONT DESK ALARM | | | 10/25/2018 | | DONE |
|
|
|
Plans approved with review comments and drawing notes.
|
Application received | | | 10/23/2018 | | DONE |
|
|
|
Application submitted via PDS Online on Oct 23 2018 9:56AM
|
Plan assigned to (Lee) | 10/23/2018 | | 10/23/2018 | | DONE |
Lee G Meredith
|
|
|
|
Miscellaneous action | | | 10/23/2018 | | DONE |
|
|
|
Emailed Sheri requesting that she fill out and email the 601 checklist form. Received via email 10-25-18.
|
Miscellaneous action | | | 10/23/2018 | | DONE |
|
|
|
Requested ceiling heights for all areas. Received via email 10-25-18.
|