INSP-Final Inspection | 5/10/2019 | 5/10/2019 | 5/10/2019 | P | PASS |
Troy Cobbley
|
|
|
Permit finaled. Previous corrections addressed.
Contact is Dirk. Phone #: ###-#### Inspection requested via web by Morgan Ahten
|
INSP-Final Inspection | 5/9/2019 | 5/9/2019 | 5/9/2019 | P | FAIL |
Mark Scharfen
|
|
|
Checked prints with cut sheets. Tested notification, gym circuit worked. On testing duct detectors, none of the fans shut down. Wires were disconnected on the fire alarm interface in the roof top unit. Protex is to fix the issue with shutdown and verify all units shut down. Next test will need to test all 5 duct detectors for shurdown.
Contact is Dirk. Phone #: ###-#### >> Inspection requested via web by Morgan Ahten
|
Plan assigned to (Lee) | 5/7/2019 | | 5/8/2019 | | DONE |
Lee G Meredith
|
|
|
|
1st review completed | | | 5/8/2019 | | PASS |
|
|
|
|
Alarm Plan Check | 5/8/2019 | | 5/8/2019 | | PASS |
Lee G Meredith
|
|
|
|
PLANS TAKEN FRONT DESK ALARM | | | 5/8/2019 | | DONE |
|
|
|
|
CHANGE STATUS TO (ISS) | | | 5/8/2019 | | DONE |
|
|
|
|
INSP-Final Inspection | 5/6/2019 | 5/7/2019 | 5/7/2019 | A | FAIL |
Mark Scharfen
|
|
|
Gym speaker circuit was not working (disabled in programming per dirk). Unable to get HVAC units running for testing shutdown. Asbuilds do not match what is installed. Gym has 115CD strobes but prints and load sheets show 110CD. Current rating doesn't match cut sheet for alarm current draw. Plans will need to be submitted as a plan mod prior to next inspection. Next inspection will have a reinspection fee.
Contact is Dirk. Phone #: ###-#### >> Inspection requested via web by Morgan Ahten
|
Plan Modification Accepted | | | 5/7/2019 | | DONE |
|
|
|
Per Morgan at Protex start a plan mod workflow
|
INSP-Final Inspection | 4/29/2019 | 4/29/2019 | 4/29/2019 | P | FAIL |
Mark Scharfen
|
|
|
No Building map at panel or remote command center. No lift to test duct detectors or check cd on strobes in gym. will reschedule.
Contact is Dirk. Phone #: ###-#### Inspection requested via web by Morgan Ahten
|
INSP-Final Inspection | 3/21/2019 | 3/22/2019 | 3/22/2019 | P | PART |
Jim Page
|
|
|
Final fire alarm inspection for phase 1 TCO complete.
Contact is Dan. Phone #: ###-#### Inspection requested via web by Morgan Ahten
|
INSP-Final Inspection | 3/20/2019 | 3/21/2019 | 3/21/2019 | P | FAIL |
Jim Page
|
|
|
Pull station in riser room mounted to low. Provide city approved drawings and small documents, no city approved drawings on site. Provide document cabinet at fire panel. Provide map showing initiating devices. Only item tested is the commercial hood interface, hood suppression system reports to panel.
Partial Final for cafeteria and commons. Contact is Dan. Phone #: ###-#### Inspection requested via web by Morgan Ahten
|
Miscellaneous action | | | 3/21/2019 | | DONE |
|
|
|
Received corrected as built riser drawing
|
Plan Modification Accepted | | | 3/20/2019 | | DONE |
|
|
|
Per Morgan at Protex
|
Plan assigned to (Lee) | 3/20/2019 | | 3/20/2019 | | DONE |
Lee G Meredith
|
|
|
|
1st review completed | | | 3/20/2019 | | PASS |
|
|
|
|
Alarm Plan Check | 3/20/2019 | | 3/20/2019 | | PASS |
Lee G Meredith
|
|
|
|
PLANS TAKEN FRONT DESK ALARM | | | 3/20/2019 | | DONE |
|
|
|
As builts passed. No additional comments.
|
Permit Ready to Issue | | | 3/20/2019 | | DONE |
|
|
|
|
CHANGE STATUS TO (ISS) | | | 3/20/2019 | | DONE |
|
|
|
plan mod as built
|
Miscellaneous action | | | 3/12/2019 | | DONE |
|
|
|
Rob called to say the school district decided to remove interface between buildings but the seperate GSM will be kept. I told him to provide as builts when tiime for sign off.
|
Miscellaneous action | | | 2/28/2019 | | DONE |
|
|
|
Received product data for a GSM communicator and updated riser drawing.
|
Plan assigned to (Lee) | 10/26/2018 | | 10/29/2018 | | DONE |
Lee G Meredith
|
|
|
|
Miscellaneous action | | | 10/29/2018 | | DONE |
|
|
|
Emailed Morgan to request ceiling heights. He responded to indicate common areas are 9 feet and gym is 28 feet.
|
1st review completed | | | 10/29/2018 | | PASS |
|
|
|
|
Alarm Plan Check | 10/26/2018 | | 10/29/2018 | | PASS |
Lee G Meredith
|
|
|
|
PLANS TAKEN FRONT DESK ALARM | | | 10/29/2018 | | DONE |
|
|
|
Design passed with review comments.
|
Permit Ready to Issue | | | 10/29/2018 | | DONE |
|
|
|
all requirements met
|
Issue and Print Permit | | | 10/29/2018 | | DONE |
|
|
|
|
Application received | | | 10/24/2018 | | DONE |
|
|
|
Application submitted via PDS Online on Oct 24 2018 3:34PM
|