INSP-Final Inspection | 1/2/2019 | 1/3/2019 | 1/3/2019 | A | PASS |
Jim Page
|
|
|
Final fire sprinkler inspection for area of work complete.
Need to do at 7am Phone #: ###-#### Inspection requested via web by Sam Ball
|
INSP-Final Inspection | 12/27/2018 | 1/2/2019 | 1/2/2019 | A | CANC |
Jim Page
|
|
|
Need To meet down at the building at 7 AM to set off the alarms. Phone #: ###-#### >> Inspection requested via web by Sam Ball Inspection cancelled from web by: Sam Ball
|
INSP-Sprinkler Rough-in | 12/3/2018 | 12/4/2018 | 12/4/2018 | A | PASS |
Troy Cobbley
|
|
|
Corrections made. All piping can be covered.
Phone #: ###-#### Inspection requested via web by Sam Ball
|
INSP-Sprinkler Rough-in | 12/3/2018 | 12/3/2018 | 12/3/2018 | P | PART |
Troy Cobbley
|
|
|
Piping is ok to cover but the new branchline is shown to be 1 1/4" and has been installed as 1". Also this new line needs a branch line restraint.
Phone #: ###-#### Inspection requested via web by Sam Ball
|
Sprinkler Plan Check | 11/1/2018 | | 11/1/2018 | | PASS |
Tim Frost
|
|
|
Please, see attached comments.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 11/1/2018 | | DONE |
Tim Frost
|
|
|
|
Permit Ready to Issue | | | 11/1/2018 | | DONE |
|
|
|
|
Issue and Print Permit | | | 11/1/2018 | | DONE |
|
|
|
|
Intake Approval | | | 10/31/2018 | | PASS |
Tim Frost
|
|
|
|
Plan assigned to (Tim) | 10/31/2018 | | 10/31/2018 | | DONE |
Tim Frost
|
|
|
|
Sprinkler Plan Check | 10/31/2018 | | 10/31/2018 | | FAIL |
Tim Frost
|
|
|
|
1st review completed | | | 10/31/2018 | | FAIL |
Tim Frost
|
|
|
|
Application received | | | 10/30/2018 | | DONE |
|
|
|
Application submitted via PDS Online on Oct 30 2018 10:32AM
|