Information based on query as of Wednesday, July 24, 2024.
Permit Information
Permit NumberFIR18-00852
StatusFinaled
Name STATEFIRE DC SPECIALTIES
Site Address 1005 W MAIN ST
Project NameKount TI
Customer Number 
ePlanReviewYes
Description
The fire sprinkler scope of work consists of adding, plugging and relocating sprinklers to accommodate new wall and ceiling configuration.

• Core and shell piping is under permit FIR18-00420
• The underground piping is under permit GIT18-00132

[BLD18-01753]
Permit for tenant improvements to an existing 5 story building with work to include the build-out of the interior tenant spaces. The 2nd through the 5th stories are to be occupied by a single tenant. The 5th story is a first time T.I as the story was added under a previous permit. This permit will establish occupancy for the main entry lobby, and the 2nd through 5th floors with separate building permits required for add any new basement and 1st story tenants. The cable guardrails will be a deferred submittal. This building is fully fire sprinklered to eliminate corridor requirements. Any alterations to the sprinkler system will require a separate permit and shall comply with NFPA 13 and 72 as regulated by the fire department. CDM

Alternative Materials and Methods:
This project includes approved code alternates to the following fire protection systems and/or building life safety systems. Please review the supplemental documents attached to this building permit case for details. Fire protection “shop drawings” shall include approved code alternate design.

• There are no AMM at this time.
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
INSP-Final Inspection4/4/20194/5/20194/5/2019APASS
DetailsJim Page
Previously noted items have been completed, final fire alarm inspection complete.

Phone #: ###-#### Inspection requested via web by jeremiah robison
Plan Modification Accepted  3/21/2019 DONE
Per H. Fillmore at Statefire, start workflow for plan modification
Plan assigned to (Stumbaugh)3/21/2019 3/21/2019 DONE
DetailsMark Stumbaugh
Sprinkler Plan Check3/21/2019 3/21/2019 PASS
DetailsMark Stumbaugh
PLANS/APPL TAKEN TO FRONT DESK  3/21/2019 DONE
DetailsMark Stumbaugh
No Fee
Plan assigned to (Stumbaugh)3/21/2019 3/21/2019 DONE
DetailsMark Stumbaugh
Permit Ready to Issue  3/21/2019 DONE
plan mod no fees per mark MAS
CHANGE STATUS TO (ISS)  3/21/2019  
plan mod
INSP-Final Inspection3/6/20193/6/20193/6/2019PPART
DetailsJim Page
Final fire sprinkler inspection is complete provided the as-builts match the added work that was completed. Once as-builts are submitted, approved and matches completed work then permit can be finaled.

Looking to get T.C.O. submital for stairs threw 3rd to fourth are in Phone #: ###-#### Inspection requested via web by jeremiah robison
INSP-Final Inspection2/28/20193/1/20193/1/2019PFAIL
DetailsJim Page
Inspection for rough in was failed, reference notes provided under rough in inspection.

Phone #: ###-#### Inspection requested via web by jeremiah robison
INSP-Sprinkler Rough-in/Hydro2/28/20193/1/20193/1/2019AFAIL
DetailsJim Page
Add head in closet on 5 as discussed. City approved drawings do not show stair opening between 3 and 4, no head under stairs, could not verify space under landing, appears to be a combustible concealed space. Close spaced sprinkler heads may be required between levels.

Rough to cover Phone #: ###-#### Inspection requested via web by jeremiah robison
INSP-Final Inspection2/26/20192/28/20192/28/2019PCANC
DetailsTroy Cobbley
No rough-in inspection has been scheduled or performed. A rough-in inspection will need to be scheduled and ceiling tile removed for the inspection. Phone #: ###-#### Inspection requested via web by jeremiah robison
INSP-Sprinkler Rough-in/Hydro1/30/20192/1/20192/1/2019ADONE
DetailsJim Page
Hydrostatic test for overhead fire sprinkler piping on levels 3, 4 and 5 witnessed, no pressure loss observed.

Floors 3,4, and 5 Phone #: ###-#### Inspection requested via web by Matthew Lewis
INSP-Sprinkler Rough-in/Hydro12/20/201812/21/201812/21/2018ACANC
DetailsJim Page
Cancelled per conversation with point of contact.

5th floor Phone #: ###-#### Inspection requested via web by Matthew Lewis
INSP-Sprinkler Rough-in/Hydro12/20/201812/21/201812/20/2018ACANC
DetailsJim Page
Phone #: ###-#### >> Inspection requested via web by Matthew Lewis Inspection cancelled from web by: Matthew Lewis
Issue and Print Permit  12/14/2018 DONE
Sprinkler Plan Check12/12/2018 12/13/2018 DONE
DetailsMark Stumbaugh
PLANS/APPL TAKEN TO FRONT DESK  12/13/2018 PASS
DetailsMark Stumbaugh
Permit Ready to Issue  12/13/2018 DONE
met
Plan resubmittals received  12/12/2018 DONE
DetailsMark Stumbaugh
Plan assigned to (Stumbaugh)12/12/2018 12/12/2018 DONE
DetailsMark Stumbaugh
Sprinkler Plan Check11/8/2018 11/8/2018 FAIL
DetailsTim Frost
1st review completed  11/8/2018 FAIL
DetailsTim Frost
Miscellaneous action  11/8/2018 DONE
DetailsTim Frost
Emailed contractor in regards to failed review.
Intake Approval  11/7/2018 PASS
DetailsTim Frost
Plan assigned to (Tim)11/7/2018 11/7/2018 DONE
DetailsTim Frost
Application received  10/31/2018 DONE
Application submitted via PDS Online on Oct 31 2018 6:08PM