Permit Information
Permit NumberFIR18-00856
StatusIssued
Name TRIBAL FIRE SYSTEMS
Site Address 8301 W SLOAN ST
Project NameShadowhills Elem School Repair
Customer Number 
ePlanReviewYes
Description
[Shadowhills Elementary School - Repair] - Quick Permit
REMOVE 2 EXISTING 4" CENTRAL DRY PIPE VALVE AND EXISTING AIR COMPRESSOR. WE WILL INSTALL 2 NEW 4" TYCO DPV-1 DRY PIPE VALVES, A POTTTER INS-1000 NITROGEN GENERATOR, AND 2 POTTER INS-PV INTELLIPURGE NITROGEN PURGE VALVES. THE PURGE VALVES WILL BE INSTALLED AT THE FURTHEST POINT FROM THE RISER AS RECOMMENDED
IN MANUFACTURES DATA SHEET. THE NEW ALARM & LOW AIR SWITCHES WILL BE CONNECTED TO THE EXISTING BELL AND ALARM PANEL. NO OTHER WORK IS PLANED UNDER THIS PERMIT.
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
INSP-Final Inspection6/5/20196/6/20196/6/2019APART
DetailsJim Page
Final inspection for scope of work has been performed, install is code compliant, permit will remain in issued status until School District AES (FIR18-00225, instructed by Boise Fire to not final any FIR permits associated with addresses that have an open permit for AES) communicator is inspected and passed. After AES is completed then an inspection request will need to be made to final this permit.Please call Clarence a couple of hours before heading out. No one is on site.

Thank you Phone #: ###-#### Inspection requested via web by Jessia Maxwell
INSP-Final Inspection6/3/20196/5/20196/5/2019PFAIL
DetailsTroy Cobbley
I called the contact number twice but could not leave a message due to voice mail being full. I went to the project site and spoke to school superintendant but did not make contact with the sprinkler contractor. No inspection performed.

Please call Clarence Phone #: ###-#### Inspection requested via web by Jessia Maxwell
INSP-Conference12/27/201812/27/201812/27/2018PDONE
DetailsTroy Cobbley
After confering with Adele and Ron a 200lb hyro test and a 24 hour air test will be required prior to a final sign off. I will need to have the installation guide for the Nitrogen Generator to verify maximum leakage allowed as well.
INSP-Final Inspection12/19/201812/20/201812/20/2018APART
DetailsTroy Cobbley
We tested the new dry pipe valves which passed. The nitrogen gererator is installed but is cycling excesivly as per discussion with the sprinkler contractor. I have contacted my supervisory and the fire dept for guidance.

Phone #: ###-#### Inspection requested via web by Chris Gregory
INSP-Sprinkler Rough-in/Hydro12/13/201812/14/201812/14/2018PCANC
DetailsJim Page
Inspection rescheduled for 17DEC2018 per conversation with point of contact. This request is cancelled.

Please call chris felty Phone #: ###-#### Inspection requested via web by Jessia Maxwell
Intake Approval  11/6/2018 PASS
DetailsTim Frost
Plan assigned to (Tim)11/6/2018 11/6/2018 PASS
DetailsTim Frost
Sprinkler Plan Check11/6/2018 11/6/2018 PASS
DetailsTim Frost
Please, see attached comments.
1st review completed  11/6/2018 PASS
DetailsTim Frost
PLANS/APPL TAKEN TO FRONT DESK  11/6/2018 DONE
DetailsTim Frost
Miscellaneous action  11/6/2018 DONE
DetailsTim Frost
*** FIELD INSPECTOR ***
The drawings do not show a backflow preventer. Since the riser assembly is being extensively replaced a backflow preventer is required. Therefore, new hydraulic calculations are required to be submitted and approved before the system can be finaled.
Permit Ready to Issue  11/6/2018 DONE
all requirements met
Issue and Print Permit  11/6/2018 DONE
Application received  11/2/2018 DONE
Application submitted via PDS Online on Nov 2 2018 12:11PM