Information based on query as of Wednesday, July 24, 2024.
Permit Information
Permit NumberFIR18-00875
StatusFinaled
Name TREASURE VALLEY FIRE PROTECTION
Site Address 1835 W COMMERCE AVE
Project NameTRIMCO OFFICE REMODEL TI
Customer Number 
ePlanReviewYes
Description
[Trimco Office Remodel TI] - Quick Permit
ADD 2 AND RELOCATE 2 DRY PENDENT HEADS TO THE NEW WALL AND CEILING LAYOUT.

[BLD18-02978]
Permit is to remodel an existing 5,100 sq. ft. office area within an existing 43,491 sq. ft. warehouse building. Approval is contingent upon adhering to the approved plans on file. Work to include: removal of select interior nonbearing walls, removal of door/door frame, removal of select plumbing fixtures, removal of select gypsum ceiling, construction of interior non-bearing walls to create (2) offices, a storage room, a break room, accessible restrooms and an open office area, select new wall infill, select new door/door frames, select ne interior windows, millwork, select new suspended acoustic and gypsum ceilings, electrical work, plumbing work, mechanical work and interior finishes in compliance with Ch. 8 of the current IBC. This building is fully Fire Sprinklered. Any alterations or modifications to the buildings Fire Sprinkler or Fire Alarm system WILL REQUIRE A SEPARATE PERMIT and shall be installed per NFPA 13 & NFPA 72 as regulated by the Boise Fire Department. **JG**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
INSP-Final Inspection1/16/20191/17/20191/17/2019APASS
DetailsJim Page
Previously noted items have been corrected, combustible material above ceing has been covered, final fire sprinkler inspection for area of work complete.

We would like to perform this inspection in conjunction with the Fire Life Safety for the BLD. Please call Mike with questions. Phone #: ###-#### Inspection requested via web by Jeff Packham
INSP-Sprinkler Rough-in11/30/201811/30/201811/30/2018PPASS
DetailsJim Page
Rough to cover inspection for overhead fire sprinkler piping in scope of work complete. Southwest storage room has two 155 degree heads that are less than 12 inches from heat register, corrections will need to be made to be code compliant. Also noted that there is exposed combustible material throughout the office area with no fire sprinkler protection in the interstitial space, corrections will need to be made to be code compliant, corrections will be verified at final inspection.



Mike Phone #: ###-####
Intake Approval  11/15/2018 PASS
DetailsTim Frost
Plan assigned to (Tim)11/15/2018 11/15/2018 DONE
DetailsTim Frost
Sprinkler Plan Check11/15/2018 11/15/2018 PASS
DetailsTim Frost
Please, see attached comments.
1st review completed  11/15/2018 PASS
DetailsTim Frost
PLANS/APPL TAKEN TO FRONT DESK  11/15/2018 DONE
DetailsTim Frost
Permit Ready to Issue  11/15/2018 DONE
Issue and Print Permit  11/15/2018 DONE
Application received  11/13/2018 DONE
Application submitted via PDS Online on Nov 13 2018 11:52AM