INSP-Final Inspection | 8/15/2019 | 8/15/2019 | 8/15/2019 | A | PASS |
Troy Cobbley
|
|
|
Permit finaled
Please call Rick with time frame Phone #: ###-#### Inspection requested via web by Jeff Packham
|
INSP-Final Inspection | 8/9/2019 | 8/9/2019 | 8/9/2019 | P | CANC |
Jim Page
|
|
|
Cancelled per conversation with point of contact, fire alarm not ready.
please call jeff with time frame Phone #: ###-#### Inspection requested via web by Jeff Packham
|
INSP-Sprinkler Rough-in/Hydro | 6/3/2019 | 6/3/2019 | 6/3/2019 | P | PASS |
Troy Cobbley
|
|
|
The overhead hydro passed with no visible loss at the guage.
Mike Phone #: ###-####
|
INSP-Sprinkler Rough-in | 5/2/2019 | 5/3/2019 | 5/3/2019 | A | PASS |
Troy Cobbley
|
|
|
Rough-in passed and piping is ok for cover for both of the entry lobbys from the gym
Rick Phone #: ###-####
|
INSP-Sprinkler Rough-in | 3/27/2019 | 3/28/2019 | 3/28/2019 | A | PASS |
Troy Cobbley
|
|
|
overhead rough-in passed. Piping above hardlids can be covered. The wood above the ceiling in the west end corridor will need to be addessed. Riser is not built yet. // Rick Phone #: ###-####
|
INSP-Sprinkler Rough-in | 12/17/2018 | 12/18/2018 | 12/18/2018 | P | PASS |
Troy Cobbley
|
|
|
Underground piping is ok for cover.
TROY NELSON IS OUR CONTACT UNDERGROUND COVER INSPECTION Phone #: ###-#### Inspection requested via web by Brad Bettencourt
|
Issue and Print Permit | | | 12/3/2018 | | DONE |
|
|
|
|
Intake Approval | | | 11/30/2018 | | PASS |
Tim Frost
|
|
|
|
Plan resubmittals received | | | 11/30/2018 | | DONE |
Tim Frost
|
|
|
|
Plan assigned to (Tim) | 11/30/2018 | | 11/30/2018 | | DONE |
Tim Frost
|
|
|
|
Sprinkler Plan Check | 11/30/2018 | | 11/30/2018 | | PASS |
Tim Frost
|
|
|
Please, see attached comments.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 11/30/2018 | | DONE |
Tim Frost
|
|
|
|
Permit Ready to Issue | | | 11/30/2018 | | DONE |
|
|
|
|
Intake Approval | | | 11/27/2018 | | PASS |
Tim Frost
|
|
|
|
Plan assigned to (Tim) | 11/27/2018 | | 11/27/2018 | | DONE |
Tim Frost
|
|
|
|
Sprinkler Plan Check | 11/27/2018 | | 11/27/2018 | | FAIL |
Tim Frost
|
|
|
|
1st review completed | | | 11/27/2018 | | FAIL |
Tim Frost
|
|
|
|
Miscellaneous action | | | 11/27/2018 | | DONE |
Tim Frost
|
|
|
Emailed contractor in regards to failed review.
|
Application received | | | 11/19/2018 | | DONE |
|
|
|
Application submitted via PDS Online on Nov 19 2018 12:35PM
|