INSP-Final Inspection | 1/2/2019 | 1/3/2019 | 1/3/2019 | A | PASS |
Jim Page
|
|
|
Final fire sprinkler inspection for area of work complete.
Jim Baker is the contact Phone #: ###-#### Inspection requested via web by Stan Beus
|
INSP-Sprinkler Rough-in | 1/2/2019 | 1/3/2019 | 1/3/2019 | A | PASS |
Jim Page
|
|
|
Previously noted items have been corrected, rough to cover inspection complete, approved for cover.
Jim Baker is the contact Phone #: ###-#### Inspection requested via web by Stan Beus
|
INSP-Final Inspection | 12/27/2018 | 12/27/2018 | 12/27/2018 | P | CANC |
Jim Page
|
|
|
Project did not pass rough in inspection, not ready for final, this request is cancelled.
Contact is Jim Baker Phone #: ###-#### Inspection requested via web by Stan Beus
|
INSP-Sprinkler Rough-in | 12/27/2018 | 12/27/2018 | 12/27/2018 | P | FAIL |
Jim Page
|
|
|
Fire sprinkler heads are overspaced in area of work, corrections are needed.
Contact is Jim Baker Phone #: ###-#### Inspection requested via web by Stan Beus
|
Plan assigned to (Stumbaugh) | 12/10/2018 | | 12/10/2018 | | DONE |
Mark Stumbaugh
|
|
|
|
Permit Ready to Issue | | | 12/10/2018 | | DONE |
|
|
|
met
|
Issue and Print Permit | | | 12/10/2018 | | DONE |
|
|
|
|
Application received | | | 12/7/2018 | | DONE |
|
|
|
Application submitted via PDS Online on Dec 7 2018 6:55AM
|
Intake Approval | | | 12/7/2018 | | PASS |
Mark Stumbaugh
|
|
|
|
Sprinkler Plan Check | 12/7/2018 | | 12/7/2018 | | PASS |
Mark Stumbaugh
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 12/7/2018 | | DONE |
Mark Stumbaugh
|
|
|
|