Information based on query as of Wednesday, July 24, 2024.
Permit Information
Permit NumberFIR18-00942
StatusFinaled
Name THORPE FIRE SPRINKLER SYSTEMS
Site Address 2313 S TRAPPER PL
Project NameHARRIS RANCH NORTH LOT 22
Customer Number 
ePlanReviewYes
Description
TFSS TO INSTALL A NEW NFPA 13D FIRE SPRINKLER SYSTEM IN THIS NEW SINGLE FAMILY DWELLING. Plan Mod 2-5-2019 Approved **MAS**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
INSP-Final Inspection4/15/20194/15/20194/15/2019PPASS
DetailsJim Page
Final fire sprinkler inspection complete.

Call James before heading out. Phone #: ###-#### Inspection requested via web by Anthony Minichiello
INSP-Final Inspection4/11/20194/12/20194/12/2019PCANC
DetailsJim Page
Cancelled per conversation with point of contact, flow switch bell not hooked up, will be rescheduled for a later date.

Call James before heading out, thank you! Phone #: ###-#### Inspection requested via web by Anthony Minichiello
INSP-Final Inspection4/11/20194/12/20194/11/2019ACANC
DetailsJim Page
Call James when heading out, thanks! Phone #: ###-#### >> Inspection requested via web by Anthony Minichiello Inspection cancelled from web by: Anthony Minichiello
Plan assigned to (Stumbaugh)2/4/2019 2/5/2019 DONE
DetailsMark Stumbaugh
Sprinkler Plan Check2/5/2019 2/5/2019 PASS
DetailsMark Stumbaugh
PLANS/APPL TAKEN TO FRONT DESK  2/5/2019 DONE
DetailsMark Stumbaugh
No Fee
Permit Ready to Issue  2/5/2019 DONE
plan mod approved
CHANGE STATUS TO (ISS)  2/5/2019 DONE
Plan Modification Accepted  2/4/2019 DONE
Adding a double check backflow device. Eplan workflow started.
INSP-Sprinkler Rough-in1/8/20191/10/20191/10/2019APASS
DetailsJim Page
Tenting inspection complete, all tenting in place at time of inspection, all fire sprinkler piping approved for cover.

Tenting inspection Phone #: ###-#### Inspection requested via web by Anthony Minichiello
INSP-Sprinkler Rough-in/Hydro1/8/20191/8/20191/8/2019PDONE
DetailsJim Page
Hydrostatic test for overhead fire sprinkler piping witnessed, no pressure loss observed at city static pressure.
INSP-Sprinkler Rough-in/Hydro1/7/20191/8/20191/8/2019APART
DetailsJim Page
Rough in inspection for overhead fire sprinkler piping complete, areas between conditioned spaces approved for cover, tenting to be installed on attic piping at a later date, areas requiring tenting not approved for cover.

Please call Anthony before heading out, thank you! Phone #: ###-#### Inspection requested via web by Anthony Minichiello
Issue and Print Permit  12/27/2018 DONE
Plan resubmittals received  12/26/2018 DONE
DetailsMark Stumbaugh
Plan assigned to (Stumbaugh)12/26/2018 12/26/2018 DONE
DetailsMark Stumbaugh
Sprinkler Plan Check12/26/2018 12/26/2018 PASS
DetailsMark Stumbaugh
PLANS/APPL TAKEN TO FRONT DESK  12/26/2018 DONE
DetailsMark Stumbaugh
Permit Ready to Issue  12/26/2018 DONE
met
Sprinkler Plan Check12/17/2018 12/20/2018 FAIL
DetailsMark Stumbaugh
Application received  12/17/2018 DONE
Application submitted via PDS Online on Dec 17 2018 12:45PM
Intake Approval  12/17/2018 PASS
DetailsMark Stumbaugh
Plan assigned to (Stumbaugh)12/17/2018 12/17/2018 DONE
DetailsMark Stumbaugh