INSP-Final Inspection | 3/12/2019 | 3/15/2019 | 3/15/2019 | A | PASS |
Jim Page
|
|
|
Please contact nate roughly 15 mins to arrival Phone #: ###-#### >> Inspection requested via web by jason petty
Verified all outstanding items were met.
|
DOC - Permit Finaled | | | 3/15/2019 | | DONE |
|
|
|
|
CHANGE STATUS TO (ISS) | | | 3/12/2019 | | DONE |
|
|
|
inspector didn't mean to final permit
|
INSP-Final Inspection | 3/6/2019 | 3/6/2019 | 3/6/2019 | A | FAIL |
Troy Cobbley
|
|
|
Tested 100% panel functionality. Sprinkler monitoring, initiaing and notification devices. Passed test. Still need updated addresses on as-built plans and building map, AC breaker lock. There was mention of access control being added before buillding is completed. Basement has a kitchen with residential hood. Class one hood may need to be added.
Nate with Peak was on site.
|
INSP-Final Inspection | 3/4/2019 | 3/5/2019 | 3/6/2019 | P | FAIL |
Troy Cobbley
|
|
|
Tested 100% panel functionality. Sprinkler monitoring, initiaing and notification devices. Passed test. Still need updated addresses on as-built plans and building map, AC breaker lock. There was mention of access control being added before buillding is completed. Basement has a kitchen with residential hood. Class one hood may need to be added.
Please call Nate roughly 15 minutes prior to arrival. Phone #: ###-#### Inspection requested via web by jason petty
|
Miscellaneous action | | | 3/6/2019 | | DONE |
|
|
|
Scope corrected in Tidemark to indicate that a voice system was not required, as indicated in the 12-27 plan mod.
|
Miscellaneous action | | | 2/27/2019 | | DONE |
|
|
|
Mary requested the work flow be openend to upload as builts.
|
Miscellaneous action | | | 2/27/2019 | | DONE |
|
|
|
per Lee M-no fees-as built
|
Telephone call | | | 2/26/2019 | | DONE |
|
|
|
Jeremy called to discuss return duct detector placement. He indicated that he has 3 roof top units that are all tied to a central duct. Wanted to know if 1 duct detector is adequate to use for all 3. I informed him that 1 could be used, as long as there are no duct return intakes after the single duct detector. All 3 units would shut down when the single duct detector was active. This is subbject to inspectors review of the actual installation.
|
INSP-Final Inspection | 2/18/2019 | 2/20/2019 | 2/20/2019 | P | FAIL |
Troy Cobbley
|
|
|
No actual testing performed. Plan mods are needed showing the actual fire alarm panel installed, a smoke detector is needed over the facp, provide verification whether hvac shutdown is needed or not, provide plan mods or make field changes to strobes that are overspaced, provide device map as per the review comments.
Nate Schneider is point of contact, please call roughly 15 minutes prior to arriving to site. ###-#### Phone #: ###-#### Inspection requested via web by jason petty
|
Miscellaneous action | | | 2/7/2019 | | DONE |
|
|
|
Work flow openend for upload of as builts.As builts reviewed and approved.
|
Issue and Print Permit | | | 2/7/2019 | | DONE |
|
|
|
plan mod approved
|
Permit Ready to Issue | | | 2/7/2019 | | DONE |
|
|
|
plan mod approved
|
CHANGE STATUS TO (ISS) | | | 2/7/2019 | | DONE |
|
|
|
|
Plan Modification Accepted | | | 12/27/2018 | | DONE |
|
|
|
Design originall had voice evacuation speakers with strobes. Changed to horns with strobes. Speakers not required by occupancy type and load.
|
1st review completed | | | 12/27/2018 | | PASS |
|
|
|
|
Alarm Plan Check | 12/27/2018 | | 12/27/2018 | | PASS |
Lee G Meredith
|
|
|
|
PLANS TAKEN FRONT DESK ALARM | | | 12/27/2018 | | DONE |
|
|
|
Plans passed with revised comments.
|
Plan assigned to (Lee) | 12/19/2018 | | 12/26/2018 | | DONE |
Lee G Meredith
|
|
|
|
1st review completed | | | 12/26/2018 | | PASS |
|
|
|
|
Alarm Plan Check | 12/19/2018 | | 12/26/2018 | | PASS |
Lee G Meredith
|
|
|
|
PLANS TAKEN FRONT DESK ALARM | | | 12/26/2018 | | DONE |
|
|
|
Review passed with comments.
|
Permit Ready to Issue | | | 12/26/2018 | | DONE |
|
|
|
met
|
Miscellaneous action | | | 12/26/2018 | | DONE |
|
|
|
Mary emailed to inform that the design originaly submitted was incorrect. Requested that the work flow be reopened for correction upload.
|
Issue and Print Permit | | | 12/26/2018 | | DONE |
|
|
|
|
Application received | | | 12/19/2018 | | DONE |
|
|
|
Application submitted via PDS Online on Dec 19 2018 11:27AM
|