INSP-Final Inspection | 2/6/2019 | 2/7/2019 | 2/7/2019 | A | PASS |
Jim Page
|
|
|
Final fire alarm inspection for scope of work complete.
Please call 1/2 hour before arriving. Thanks Phone #: ###-#### Inspection requested via web by david davis
|
Plan resubmittals received | | | 1/29/2019 | | DONE |
|
|
|
|
Alarm Plan Check | 1/29/2019 | | 1/29/2019 | | PASS |
Lee G Meredith
|
|
|
|
PLANS TAKEN FRONT DESK ALARM | | | 1/29/2019 | | DONE |
|
|
|
Quick permit passed. No review comments.
|
Permit Ready to Issue | | | 1/29/2019 | | DONE |
|
|
|
met
|
Issue and Print Permit | | | 1/29/2019 | | DONE |
|
|
|
|
Plan assigned to (Lee) | 1/3/2019 | | 1/3/2019 | | DONE |
Lee G Meredith
|
|
|
|
1st review completed | | | 1/3/2019 | | FAIL |
|
|
|
Drawings FA3.1, 5.1 and 6.1 are rotated in a manner that does not allow for proper staming. All 3 need to be rotated 90 degrees CC.
|
Application received | | | 12/19/2018 | | DONE |
|
|
|
Application submitted via PDS Online on Dec 19 2018 12:20PM
|