INSP-Final Inspection | 2/4/2019 | 2/4/2019 | 2/4/2019 | P | PASS |
Troy Cobbley
|
|
|
permit finaled
Tony Phone #: ###-####
|
INSP-Sprinkler Rough-in | 1/23/2019 | 1/24/2019 | 1/24/2019 | A | PASS |
Troy Cobbley
|
|
|
Rough-in passed. Piping can be covered.
Kerri Phone #: ###-####
|
Sprinkler Plan Check | 12/31/2018 | | 12/31/2018 | | PASS |
Mark Stumbaugh
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 12/31/2018 | | PASS |
Mark Stumbaugh
|
|
|
|
Permit Ready to Issue | | | 12/31/2018 | | DONE |
|
|
|
met
|
Issue and Print Permit | | | 12/31/2018 | | DONE |
|
|
|
|
Application received | | | 12/28/2018 | | DONE |
|
|
|
Application submitted via PDS Online on Dec 28 2018 11:30AM
|
Intake Approval | | | 12/28/2018 | | PASS |
Mark Stumbaugh
|
|
|
|
Plan assigned to (Stumbaugh) | 12/28/2018 | | 12/28/2018 | | DONE |
Mark Stumbaugh
|
|
|
|