INSP-Final Inspection | 6/3/2019 | 6/6/2019 | 6/6/2019 | P | PART |
Jim Page
|
|
|
Final inspection for scope of work has been performed, install is code compliant, permit will remain in issued status until School District AES (FIR18-00344, instructed by Boise Fire to not final any FIR permits associated with addresses that have an open permit for AES) communicator is inspected and passed. After AES is completed then an inspection request will need to be made to final this permit.
Bret Bailey, Dispatcher Phone #: ###-#### Inspection requested via web by John Siewert
|
Plan assigned to (Lee) | 5/15/2019 | | 5/28/2019 | | DONE |
Lee G Meredith
|
|
|
|
1st review completed | | | 5/28/2019 | | PASS |
|
|
|
|
Alarm Plan Check | 5/24/2019 | | 5/28/2019 | | PASS |
Lee G Meredith
|
|
|
|
PLANS TAKEN FRONT DESK ALARM | | | 5/28/2019 | | DONE |
|
|
|
As built - no fee.
|
Permit Ready to Issue | | | 5/28/2019 | | DONE |
|
|
|
|
CHANGE STATUS TO (ISS) | | | 5/28/2019 | | DONE |
|
|
|
|
Plan resubmittals received | | | 5/15/2019 | | DONE |
|
|
|
John from Fire Sentry Systems asked for the workflow to be opened for as built drawings.
|
Plan assigned to (Lee) | 12/31/2018 | | 1/2/2019 | | DONE |
Lee G Meredith
|
|
|
|
Miscellaneous action | | | 1/2/2019 | | DONE |
|
|
|
Confirmed with John via email that in duct detectors will be used for dampers and sample tube duct detectors will be used for air handlers.
|
1st review completed | | | 1/2/2019 | | PASS |
|
|
|
|
Alarm Plan Check | 12/31/2018 | | 1/2/2019 | | DONE |
Lee G Meredith
|
|
|
|
PLANS TAKEN FRONT DESK ALARM | | | 1/2/2019 | | DONE |
|
|
|
Plans passed with review comments.
|
Permit Ready to Issue | | | 1/2/2019 | | DONE |
|
|
|
met
|
Issue and Print Permit | | | 1/2/2019 | | DONE |
|
|
|
|
Application received | | | 12/31/2018 | | DONE |
|
|
|
Application submitted via PDS Online on Dec 31 2018 3:32PM
|