INSP-Final Inspection | 1/18/2019 | 1/23/2019 | 1/23/2019 | A | PASS |
Jim Page
|
|
|
Final fire alarm inspection for area of work complete.
Phone #: ###-#### Inspection requested via web by Ken Webster
|
INSP-Final Inspection | 1/16/2019 | 1/18/2019 | 1/18/2019 | A | CANC |
Troy Cobbley
|
|
|
Cancel per General Contractor. Phone #: ###-#### Inspection requested via web by Ken Webster
|
Miscellaneous action | | | 1/18/2019 | | DONE |
|
|
|
As built drawings received. Required changes noted on passed drawings has veen addressed.The drawings passed review and are to be verified by inspector.
|
Issue and Print Permit | | | 1/7/2019 | | DONE |
|
|
|
|
Plan assigned to (Lee) | 1/3/2019 | | 1/4/2019 | | DONE |
Lee G Meredith
|
|
|
|
1st review completed | | | 1/4/2019 | | PASS |
|
|
|
|
Alarm Plan Check | 1/4/2019 | | 1/4/2019 | | PASS |
Lee G Meredith
|
|
|
|
PLANS TAKEN FRONT DESK ALARM | | | 1/4/2019 | | DONE |
|
|
|
Plans passed with review comments, as noted on drawings.
|
Permit Ready to Issue | | | 1/4/2019 | | DONE |
|
|
|
met
|
Application received | | | 1/3/2019 | | DONE |
|
|
|
Application submitted via PDS Online on Jan 3 2019 10:13AM
|