INSP-Final Inspection | 3/1/2019 | 3/4/2019 | 3/4/2019 | P | PASS |
Troy Cobbley
|
|
|
Permit finaled.
ADAM CHITWOOD Phone #: ###-#### Inspection requested via web by Brodie Stenquist
|
INSP-Final Inspection | 2/7/2019 | 2/7/2019 | 2/7/2019 | P | FAIL |
Troy Cobbley
|
|
|
Not ready for final due to missing ceiling tile. Rough-in passed piping is ok for cover.
Adam Phone #: ###-####
|
Intake Approval | | | 1/8/2019 | | PASS |
Mark Stumbaugh
|
|
|
|
Plan assigned to (Stumbaugh) | 1/8/2019 | | 1/8/2019 | | DONE |
Mark Stumbaugh
|
|
|
|
Sprinkler Plan Check | 1/8/2019 | | 1/8/2019 | | PASS |
Mark Stumbaugh
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 1/8/2019 | | PASS |
Mark Stumbaugh
|
|
|
|
Permit Ready to Issue | | | 1/8/2019 | | DONE |
|
|
|
met
|
Issue and Print Permit | | | 1/8/2019 | | DONE |
|
|
|
|
Application received | | | 1/7/2019 | | DONE |
|
|
|
Application submitted via PDS Online on Jan 7 2019 11:40AM
|