Information based on query as of Wednesday, July 24, 2024.
Permit Information
Permit NumberFIR19-00018
StatusFinaled
Name THORPE FIRE SPRINKLER SYSTEMS
Site Address 5131 N CORRALERO LN
Project NameHACKBERRY NORTH LOT 6
Customer Number 
ePlanReviewYes
Description
TFSS TO INSTALL A NEW NFPA 13D FIRE SPRINKLER SYSTEM IN THIS NEW SINGLE FAMILY DWELLING.
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
INSP-Final Inspection3/21/20193/22/20193/22/2019PPASS
DetailsJim Page
Previoulsy noteed items have been corrected, final fire sprinkler inspection complete.

Call before heading out, thanks! Phone #: ###-#### Inspection requested via web by Anthony Minichiello
INSP-Final Inspection3/19/20193/21/20193/21/2019PFAIL
DetailsJim Page
Escutcheon does cover entire hole from sprinkler penetration in numerous areas. Exposed CPVC from backflow to riser needs to be changed, cannot have exposed CPVC. Provide 911 signage on fire bell. Irrigation shutdown not wired correctly.

Call before heading out, thanks! Phone #: ###-#### Inspection requested via web by Anthony Minichiello
INSP-Sprinkler Rough-in1/29/20191/30/20191/30/2019APASS
DetailsJim Page
Overhead fire sprinkler piping/tenting inspection complete, all tenting installed at time of inspection, cover is approved.

Tenting inspection, confirmed complete and ready for inspection. Please let Alicia know if there are any issues. Thanks! Phone #: ###-#### Inspection requested via web by Anthony Minichiello
INSP-Sprinkler Rough-in1/28/20191/29/20191/29/2019AFAIL
DetailsJim Page
All tenting not installed at time of inspection.

Tenting Phone #: ###-#### Inspection requested via web by Anthony Minichiello
Sprinkler Plan Check1/28/2019 1/29/2019 PASS
DetailsMark Stumbaugh
PLANS/APPL TAKEN TO FRONT DESK  1/29/2019 DONE
DetailsMark Stumbaugh
CHANGE STATUS TO (ISS)  1/29/2019 DONE
Plan mod, no fee per Mark
Intake Approval  1/28/2019 PASS
DetailsMark Stumbaugh
Plan Modification Accepted  1/28/2019 DONE
DetailsMark Stumbaugh
Plan assigned to (Stumbaugh)1/28/2019 1/28/2019 DONE
DetailsMark Stumbaugh
INSP-Sprinkler Rough-in/Hydro1/25/20191/25/20191/25/2019PDONE
DetailsJim Page
Hydrostatic test for overhead fire sprinkler piping witnessed with anti-freeze, no pressure loss observed.
INSP-Sprinkler Rough-in/Hydro1/24/20191/25/20191/25/2019APART
DetailsJim Page
Rough in inspection for overhead fire sprinkler piping complete, piping located between conditioned spaqces approved for cover, tenting is required before cover in areas where piping is in attic spaces.

Call Alicia before heading out, will be ready early. This is up off Bogus Basin Rd. Phone #: ###-#### Inspection requested via web by Anthony Minichiello
Issue and Print Permit  1/24/2019 DONE
(F) Reprint permit  1/24/2019 DONE
Application received  1/10/2019 DONE
Application submitted via PDS Online on Jan 10 2019 6:20AM
Intake Approval  1/10/2019 PASS
DetailsMark Stumbaugh
Plan assigned to (Stumbaugh)1/10/2019 1/10/2019 DONE
DetailsMark Stumbaugh
Sprinkler Plan Check1/10/2019 1/10/2019 PASS
DetailsMark Stumbaugh
PLANS/APPL TAKEN TO FRONT DESK  1/10/2019 PASS
DetailsMark Stumbaugh
Permit Ready to Issue  1/10/2019 DONE
met