Information based on query as of Wednesday, July 24, 2024.
Permit Information
Permit NumberFIR19-00032
StatusFinaled
Name SHILO AUTOMATIC SPRINKLER CO
Site Address 11740 W KING ST
Project NameFairview Apartments 8-Plex #D2
Customer Number 
ePlanReviewYes
Description
Shilo will install a new 4" C900 and 2" CPVC pipe UG line for the new 8-Plex per NFPA 13R and City of Boise.
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
INSP-Final Inspection6/3/20196/4/20196/4/2019APASS
DetailsTroy Cobbley
Permit finaled


Gabe Garduno is the contact. Thank you for your hard work! Phone #: ###-#### Inspection requested via web by Stan Beus
INSP-Sprinkler Rough-in/Hydro5/10/20195/13/20195/13/2019APASS
DetailsTroy Cobbley
Underground hydro test witnessed with no loss on the guage

Gabe Garduno is the contact. This is for a hydro only, in connection with the flush scheduled for the same day and time. Thank you for your hard work! Phone #: ###-#### Inspection requested via web by Stan Beus
INSP-Supply line flush5/10/20195/13/20195/13/2019APASS
DetailsTroy Cobbley
Underground supply line flush witnessed.
INSP-Sprinkler Rough-in2/7/20192/7/20192/7/2019PPASS
DetailsJim Page
Rough to cover inspection for undergorund supply complete, approved for cover.

Call Jim Page to verify he witnessed pipe installation back in 2018. Shilo contact is Brian Collins. Thank you for everything you do! Phone #: ###-#### Inspection requested via web by Stan Beus
Plan resubmittals received  1/18/2019 DONE
DetailsMark Stumbaugh
Intake Approval  1/18/2019 PASS
DetailsMark Stumbaugh
Plan assigned to (Stumbaugh)1/18/2019 1/18/2019 DONE
DetailsMark Stumbaugh
Sprinkler Plan Check1/18/2019 1/18/2019 PASS
DetailsMark Stumbaugh
PLANS/APPL TAKEN TO FRONT DESK  1/18/2019 DONE
DetailsMark Stumbaugh
Permit Ready to Issue  1/18/2019 DONE
met
Issue and Print Permit  1/18/2019 DONE
Sprinkler Plan Check1/17/2019 1/17/2019 FAIL
DetailsMark Stumbaugh
Corrections needed
PLANS/APPL TAKEN TO FRONT DESK  1/17/2019 FAIL
DetailsMark Stumbaugh
Correction needed
Intake Approval  1/16/2019 PASS
DetailsMark Stumbaugh
Plan assigned to (Stumbaugh)1/16/2019 1/16/2019 DONE
DetailsMark Stumbaugh
Application received  1/15/2019 DONE
Application submitted via PDS Online on Jan 15 2019 7:05PM