INSP-Final Inspection | 8/29/2019 | 8/29/2019 | 8/29/2019 | P | PASS |
Troy Cobbley
|
|
|
Permit finaled. Nick Phone #: ###-####
|
INSP-Final Inspection | 8/21/2019 | 8/22/2019 | 8/22/2019 | P | FAIL |
Troy Cobbley
|
|
|
Need insulation and cover inspection for the piping in the storage closets.
Call ahead to Nick @ ###-#### Phone #: ###-#### Inspection requested via web by Kristin Dolan (change inspection to this afternoon, 8-22, per kristin dolan)
|
INSP-Final Inspection | 8/12/2019 | 8/12/2019 | 8/12/2019 | P | CANC |
Troy Cobbley
|
|
|
Phone #: ###-#### >> Inspection requested via web by Kristin Dolan Inspection cancelled from web by: Kristin Dolan
|
CHANGE STATUS TO (ISS) | | | 7/2/2019 | | DONE |
|
|
|
|
Plan Modification Accepted | | | 7/1/2019 | | FAIL |
Mark Stumbaugh
|
|
|
No plan mod letter, or clouded areas showing what changed.
|
Plan Modification Accepted | | | 7/1/2019 | | PASS |
Mark Stumbaugh
|
|
|
|
Sprinkler Plan Check | 7/1/2019 | | 7/1/2019 | | PASS |
Mark Stumbaugh
|
|
|
|
Plan assigned to (Stumbaugh) | 7/1/2019 | | 7/1/2019 | | DONE |
Mark Stumbaugh
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 7/1/2019 | | DONE |
Mark Stumbaugh
|
|
|
Plan Mod Fee $150.00
|
Permit Ready to Issue | | | 7/1/2019 | | DONE |
|
|
|
plan mod-do not re issue
|
Plan assigned to (Stumbaugh) | 4/24/2019 | | 5/1/2019 | | DONE |
Mark Stumbaugh
|
|
|
|
Plan Modification Accepted | | | 5/1/2019 | | FAIL |
Mark Stumbaugh
|
|
|
|
INSP-Sprinkler Rough-in/Hydro | 4/29/2019 | 4/30/2019 | 4/30/2019 | A | PASS |
Troy Cobbley
|
|
|
The overhead hydro test witnessed with no visible loss on the guage. Todd Phone #: ###-####
|
INSP-Supply line flush | 4/25/2019 | 4/26/2019 | 4/26/2019 | A | PASS |
Troy Cobbley
|
|
|
Underground flush witnessed
Nick Phone #: ###-####
|
Plan Modification Accepted | | | 4/24/2019 | | DONE |
|
|
|
Plan Mod DO NOT REISSUE per Kristin Nolan
|
INSP-Sprinkler Rough-in | 4/9/2019 | 4/9/2019 | 4/9/2019 | P | PART |
Troy Cobbley
|
|
|
Rough-in and tenting inspection passed. Plan modifications are needed showing the correct addrss (not building A), the additional pendant heads and pipe size changes prior to a final sign off. Also there were not review comments on site. These notes are required. No additional inspections on the remaining building will be given without the notes. If the notes require anything that has not been previously addressed it is the contractors responcibility to provide the changes at their cost. I let the general contractor know this as a condition for cover on this building. Piping is ok for cover.
Christen Phone #: ###-####
|
INSP-Sprinkler Rough-in | 4/8/2019 | 4/9/2019 | 4/9/2019 | A | FAIL |
Troy Cobbley
|
|
|
The job site gate is locked so no inspection was performed.
Approved plans will be onsite in building A where the inspection will occur. Phone #: ###-#### Inspection requested via web by Kristin Dolan
|
Sprinkler Plan Check | 4/3/2019 | | 4/8/2019 | | PASS |
Mark Stumbaugh
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 4/8/2019 | | DONE |
Mark Stumbaugh
|
|
|
Fee $101.25
|
Permit Ready to Issue | | | 4/8/2019 | | DONE |
|
|
|
plan mod accepted
|
Issue and Print Permit | | | 4/8/2019 | | DONE |
|
|
|
|
Plan resubmittals received | | | 4/3/2019 | | PASS |
Mark Stumbaugh
|
|
|
|
Plan assigned to (Stumbaugh) | 4/3/2019 | | 4/3/2019 | | DONE |
Mark Stumbaugh
|
|
|
|
Plan Modification Accepted | | | 3/28/2019 | | PASS |
Mark Stumbaugh
|
|
|
|
Plan assigned to (Stumbaugh) | 3/28/2019 | | 3/28/2019 | | DONE |
Mark Stumbaugh
|
|
|
|
Sprinkler Plan Check | 3/28/2019 | | 3/28/2019 | | FAIL |
Mark Stumbaugh
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 3/28/2019 | | DONE |
Mark Stumbaugh
|
|
|
|
Plan Modification Accepted | | | 3/27/2019 | | FAIL |
Mark Stumbaugh
|
|
|
|
Plan Modification Accepted | | | 3/27/2019 | | FAIL |
Mark Stumbaugh
|
|
|
|
Plan Modification Accepted | | | 3/25/2019 | | FAIL |
Mark Stumbaugh
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 3/25/2019 | | DONE |
Mark Stumbaugh
|
|
|
|
Plan assigned to (Stumbaugh) | 3/15/2019 | | 3/20/2019 | | DONE |
Mark Stumbaugh
|
|
|
|
Plan Modification Accepted | | | 3/20/2019 | | FAIL |
Mark Stumbaugh
|
|
|
|
Plan Modification Accepted | | | 3/15/2019 | | DONE |
|
|
|
per Kristin started plan mod-changing mvoing risers-adding sheet # FP1
|
Issue and Print Permit | | | 1/31/2019 | | DONE |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 1/30/2019 | | DONE |
Mark Stumbaugh
|
|
|
|
Permit Ready to Issue | | | 1/30/2019 | | DONE |
|
|
|
met
|
Sprinkler Plan Check | 1/28/2019 | | 1/30/2019 | | PASS |
Mark Stumbaugh
|
|
|
|
Miscellaneous action | | | 1/29/2019 | | DONE |
|
|
|
wrong address on app 9357 W Cory Ln - changed address per Mark Stumbaugh
|
Intake Approval | | | 1/28/2019 | | PASS |
Mark Stumbaugh
|
|
|
|
Plan assigned to (Stumbaugh) | 1/28/2019 | | 1/28/2019 | | DONE |
Mark Stumbaugh
|
|
|
|
Application received | | | 1/16/2019 | | DONE |
|
|
|
Application submitted via PDS Online on Jan 16 2019 11:00AM
|