Permit Information
Permit NumberFIR19-00033
StatusFinaled
Name JOHNSON CONTROLS FIRE PROTECTION
Site Address 9351 W CORY LN
Project NameAventura West
Customer Number 
ePlanReviewYes
Description
Install 4 new wet pipe fire sprinkler systems throughout the 4 new apartment buildings at one foot above the floor in the mechanical room of each building
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
INSP-Final Inspection8/29/20198/29/20198/29/2019PPASS
DetailsTroy Cobbley
Permit finaled. Nick Phone #: ###-####
INSP-Final Inspection8/21/20198/22/20198/22/2019PFAIL
DetailsTroy Cobbley
Need insulation and cover inspection for the piping in the storage closets.


Call ahead to Nick @ ###-#### Phone #: ###-#### Inspection requested via web by Kristin Dolan (change inspection to this afternoon, 8-22, per kristin dolan)
INSP-Final Inspection8/12/20198/12/20198/12/2019PCANC
DetailsTroy Cobbley
Phone #: ###-#### >> Inspection requested via web by Kristin Dolan Inspection cancelled from web by: Kristin Dolan
CHANGE STATUS TO (ISS)  7/2/2019 DONE
Plan Modification Accepted  7/1/2019 FAIL
DetailsMark Stumbaugh
No plan mod letter, or clouded areas showing what changed.
Plan Modification Accepted  7/1/2019 PASS
DetailsMark Stumbaugh
Sprinkler Plan Check7/1/2019 7/1/2019 PASS
DetailsMark Stumbaugh
Plan assigned to (Stumbaugh)7/1/2019 7/1/2019 DONE
DetailsMark Stumbaugh
PLANS/APPL TAKEN TO FRONT DESK  7/1/2019 DONE
DetailsMark Stumbaugh
Plan Mod Fee $150.00
Permit Ready to Issue  7/1/2019 DONE
plan mod-do not re issue
Plan assigned to (Stumbaugh)4/24/2019 5/1/2019 DONE
DetailsMark Stumbaugh
Plan Modification Accepted  5/1/2019 FAIL
DetailsMark Stumbaugh
INSP-Sprinkler Rough-in/Hydro4/29/20194/30/20194/30/2019APASS
DetailsTroy Cobbley
The overhead hydro test witnessed with no visible loss on the guage. Todd Phone #: ###-####
INSP-Supply line flush4/25/20194/26/20194/26/2019APASS
DetailsTroy Cobbley
Underground flush witnessed

Nick Phone #: ###-####
Plan Modification Accepted  4/24/2019 DONE
Plan Mod DO NOT REISSUE per Kristin Nolan
INSP-Sprinkler Rough-in4/9/20194/9/20194/9/2019PPART
DetailsTroy Cobbley
Rough-in and tenting inspection passed. Plan modifications are needed showing the correct addrss (not building A), the additional pendant heads and pipe size changes prior to a final sign off. Also there were not review comments on site. These notes are required. No additional inspections on the remaining building will be given without the notes. If the notes require anything that has not been previously addressed it is the contractors responcibility to provide the changes at their cost. I let the general contractor know this as a condition for cover on this building. Piping is ok for cover.


Christen Phone #: ###-####
INSP-Sprinkler Rough-in4/8/20194/9/20194/9/2019AFAIL
DetailsTroy Cobbley
The job site gate is locked so no inspection was performed.

Approved plans will be onsite in building A where the inspection will occur. Phone #: ###-#### Inspection requested via web by Kristin Dolan
Sprinkler Plan Check4/3/2019 4/8/2019 PASS
DetailsMark Stumbaugh
PLANS/APPL TAKEN TO FRONT DESK  4/8/2019 DONE
DetailsMark Stumbaugh
Fee $101.25
Permit Ready to Issue  4/8/2019 DONE
plan mod accepted
Issue and Print Permit  4/8/2019 DONE
Plan resubmittals received  4/3/2019 PASS
DetailsMark Stumbaugh
Plan assigned to (Stumbaugh)4/3/2019 4/3/2019 DONE
DetailsMark Stumbaugh
Plan Modification Accepted  3/28/2019 PASS
DetailsMark Stumbaugh
Plan assigned to (Stumbaugh)3/28/2019 3/28/2019 DONE
DetailsMark Stumbaugh
Sprinkler Plan Check3/28/2019 3/28/2019 FAIL
DetailsMark Stumbaugh
PLANS/APPL TAKEN TO FRONT DESK  3/28/2019 DONE
DetailsMark Stumbaugh
Plan Modification Accepted  3/27/2019 FAIL
DetailsMark Stumbaugh
Plan Modification Accepted  3/27/2019 FAIL
DetailsMark Stumbaugh
Plan Modification Accepted  3/25/2019 FAIL
DetailsMark Stumbaugh
PLANS/APPL TAKEN TO FRONT DESK  3/25/2019 DONE
DetailsMark Stumbaugh
Plan assigned to (Stumbaugh)3/15/2019 3/20/2019 DONE
DetailsMark Stumbaugh
Plan Modification Accepted  3/20/2019 FAIL
DetailsMark Stumbaugh
Plan Modification Accepted  3/15/2019 DONE
per Kristin started plan mod-changing mvoing risers-adding sheet # FP1
Issue and Print Permit  1/31/2019 DONE
PLANS/APPL TAKEN TO FRONT DESK  1/30/2019 DONE
DetailsMark Stumbaugh
Permit Ready to Issue  1/30/2019 DONE
met
Sprinkler Plan Check1/28/2019 1/30/2019 PASS
DetailsMark Stumbaugh
Miscellaneous action  1/29/2019 DONE
wrong address on app 9357 W Cory Ln - changed address per Mark Stumbaugh
Intake Approval  1/28/2019 PASS
DetailsMark Stumbaugh
Plan assigned to (Stumbaugh)1/28/2019 1/28/2019 DONE
DetailsMark Stumbaugh
Application received  1/16/2019 DONE
Application submitted via PDS Online on Jan 16 2019 11:00AM