INSP-Final Inspection | 11/21/2019 | 11/22/2019 | 11/22/2019 | A | PASS |
Jim Page
|
|
|
Final fire alarm inspection complete.
Phone #: ###-#### Inspection requested via web by Ken Webster
|
INSP-Final Inspection | 11/21/2019 | 11/21/2019 | 11/21/2019 | A | PART |
Jim Page
|
|
|
Partial final complete for fire alarm inspection. Initiating devices and audio visual devices tested, last item to test will be FDC bell after install.
Phone #: ###-#### Inspection requested via web by Ken Webster
|
INSP-Final Inspection | 11/18/2019 | 11/19/2019 | 11/18/2019 | A | CANC |
Jim Page
|
|
|
Please contact Buck for Inspection. Phone #: ###-#### >> Inspection requested via web by Ken Webster Inspection cancelled from web by: Ken Webster
|
Plan assigned to (Lee) | 10/10/2019 | | 10/25/2019 | | DONE |
Lee G Meredith
|
|
|
as built
|
1st review completed | | | 10/25/2019 | | PASS |
|
|
|
|
Alarm Plan Check | 10/25/2019 | | 10/25/2019 | | PASS |
Lee G Meredith
|
|
|
|
PLANS TAKEN FRONT DESK ALARM | | | 10/25/2019 | | DONE |
|
|
|
As built - no fee.
|
Permit Ready to Issue | | | 10/25/2019 | | DONE |
|
|
|
|
CHANGE STATUS TO (ISS) | | | 10/25/2019 | | DONE |
|
|
|
|
Plan resubmittals received | | | 10/10/2019 | | DONE |
|
|
|
start as built workflow per Rita at Webster
|
INSP-Conference | 10/3/2019 | 10/4/2019 | 10/4/2019 | A | DONE |
Jim Page
|
|
|
Fire conference is complete, city approved plans have been notated for the minor corrections required.
FIRE ALARM Phone #: ###-#### Inspection requested via web by Ken Webster
|
INSP-Conference | 9/27/2019 | 9/30/2019 | 9/30/2019 | A | PART |
Jim Page
|
|
|
Fire conference partially complete, walked level 1 and basement level, technician on site has a few minor corrections, will verify corrections on final walk through, still need to perform walk through on level 2.
hone #: ###-#### Inspection requested via web by Ken Webster
|
CHANGE STATUS TO (ISS) | | | 9/27/2019 | | DONE |
|
|
|
|
Plan assigned to (Lee) | 9/24/2019 | | 9/26/2019 | | DONE |
Lee G Meredith
|
|
|
|
1st review completed | | | 9/26/2019 | | PASS |
|
|
|
|
Alarm Plan Check | 9/26/2019 | | 9/26/2019 | | PASS |
Lee G Meredith
|
|
|
|
PLANS TAKEN FRONT DESK ALARM | | | 9/26/2019 | | DONE |
|
|
|
Plan mod approved as noted. No additional plan review comments.
|
Permit Ready to Issue | | | 9/26/2019 | | DONE |
|
|
|
plan mod approved
DO NOT REISSUE
|
Plan resubmittals received | | | 9/24/2019 | | DONE |
|
|
|
start as built work flow per Rita from Webster Fire
|
Plan resubmittals received | | | 2/15/2019 | | DONE |
|
|
|
|
Alarm Plan Check | 2/12/2019 | | 2/15/2019 | | PASS |
Lee G Meredith
|
|
|
Passed as noted.
|
PLANS TAKEN FRONT DESK ALARM | | | 2/15/2019 | | DONE |
|
|
|
Resubmittal passed with review comments and drawing notation.
|
Permit Ready to Issue | | | 2/15/2019 | | DONE |
|
|
|
met
|
Issue and Print Permit | | | 2/15/2019 | | DONE |
|
|
|
|
Plan assigned to (Lee) | 1/25/2019 | | 1/25/2019 | | DONE |
Lee G Meredith
|
|
|
|
1st review completed | | | 1/25/2019 | | FAIL |
|
|
|
See 1st review comments.
|
Application received | | | 1/24/2019 | | DONE |
|
|
|
Application submitted via PDS Online on Jan 24 2019 7:32PM
|