INSP-Final Inspection | 3/22/2019 | 3/25/2019 | 3/25/2019 | A | PASS |
Troy Cobbley
|
|
|
Permit finaled
Phone #: ###-#### Inspection requested via web by Sam Ball
|
INSP-Sprinkler Rough-in | 3/25/2019 | 3/25/2019 | 3/25/2019 | P | PASS |
Troy Cobbley
|
|
|
Rough-in passed. Piping can be covered.
Phone #: ###-#### Inspection requested via web by Sam Ball
|
Issue and Print Permit | | | 2/6/2019 | | DONE |
|
|
|
|
Intake Approval | | | 2/4/2019 | | PASS |
Mark Stumbaugh
|
|
|
|
Plan assigned to (Stumbaugh) | 2/4/2019 | | 2/4/2019 | | DONE |
Mark Stumbaugh
|
|
|
|
Sprinkler Plan Check | 2/4/2019 | | 2/4/2019 | | PASS |
Mark Stumbaugh
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 2/4/2019 | | DONE |
Mark Stumbaugh
|
|
|
|
Permit Ready to Issue | | | 2/4/2019 | | DONE |
|
|
|
met
|
Application received | | | 2/1/2019 | | DONE |
|
|
|
Application submitted via PDS Online on Feb 1 2019 4:44PM
|