Permit Information
Permit NumberFIR19-00088
StatusFinaled
Name JOHNSON CONTROLS FIRE PROTECTION
Site Address 3612 W OVERLAND RD
Project NameInternational Minute Press TI
Customer Number 
ePlanReviewYes
Description
***QUICK PERMIT**MAS**Install new and relocate existing sprinkler heads for OH II Occupancy
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
INSP-Final Inspection5/28/20195/29/20195/29/2019APASS
DetailsTroy Cobbley
Permit finaled

Nick Phone #: ###-####
INSP-Final Inspection5/22/20195/23/20195/23/2019PCANC
DetailsTroy Cobbley
Per Nick they do not have access to the approved drawings at this time. Will need to be rescheduled.

Please call Nick when in route ###-#### Phone #: ###-#### Inspection requested via web by Kristin Dolan
CHANGE STATUS TO (ISS)  5/15/2019 DONE
Intake Approval  5/13/2019 PASS
DetailsMark Stumbaugh
Plan assigned to (Stumbaugh)5/13/2019 5/13/2019 DONE
DetailsMark Stumbaugh
Sprinkler Plan Check5/13/2019 5/13/2019 PASS
DetailsMark Stumbaugh
PLANS/APPL TAKEN TO FRONT DESK  5/13/2019 DONE
DetailsMark Stumbaugh
Plan Mod Fee$150.00
Permit Ready to Issue  5/13/2019 DONE
PLAN MOD
Staff review4/18/20194/18/20194/19/2019 FAIL
DetailsMark Stumbaugh
plan mod
Plan assigned to (Stumbaugh)4/18/2019 4/19/2019 DONE
DetailsMark Stumbaugh
PLANS/APPL TAKEN TO FRONT DESK  4/19/2019 DONE
DetailsMark Stumbaugh
Plan Modification Accepted  4/18/2019 DONE
Plan mod started in e plan-ad piping, sprinklers to comply with oH2 occ
INSP-Sprinkler Rough-in3/7/20193/7/20193/7/2019PFAIL
DetailsTroy Cobbley
Inspection was supposed to be a conference on the placement of pendant heads due to obstructions. Todd Phone #: ###-####
Issue and Print Permit  3/6/2019 DONE
Intake Approval  3/5/2019 PASS
DetailsMark Stumbaugh
Plan assigned to (Stumbaugh)3/5/2019 3/5/2019 DONE
DetailsMark Stumbaugh
Sprinkler Plan Check3/5/2019 3/5/2019 PASS
DetailsMark Stumbaugh
PLANS/APPL TAKEN TO FRONT DESK  3/5/2019 DONE
DetailsMark Stumbaugh
Permit Ready to Issue  3/5/2019 DONE
Intake Approval  2/22/2019 FAIL
DetailsMark Stumbaugh
Numerous items missing
Application received  2/4/2019 DONE
Application submitted via PDS Online on Feb 4 2019 1:38PM