INSP-Final Inspection | 3/26/2019 | 3/26/2019 | 3/26/2019 | P | PASS |
Troy Cobbley
|
|
|
Permit finaled
mike oswald Phone #: ###-#### Inspection requested via web by Brodie Stenquist
|
INSP-Sprinkler Rough-in | 3/1/2019 | 3/4/2019 | 3/4/2019 | A | PASS |
Troy Cobbley
|
|
|
Rough-in passed. Piping can be covered. Mike Phone #: ###-####
|
Application received | | | 2/7/2019 | | DONE |
|
|
|
Application submitted via PDS Online on Feb 7 2019 12:49PM
|
Intake Approval | | | 2/7/2019 | | PASS |
Mark Stumbaugh
|
|
|
|
Plan assigned to (Stumbaugh) | 2/7/2019 | | 2/7/2019 | | DONE |
Mark Stumbaugh
|
|
|
|
Sprinkler Plan Check | 2/7/2019 | | 2/7/2019 | | PASS |
Mark Stumbaugh
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 2/7/2019 | | DONE |
Mark Stumbaugh
|
|
|
|
Permit Ready to Issue | | | 2/7/2019 | | DONE |
|
|
|
|
Issue and Print Permit | | | 2/7/2019 | | DONE |
|
|
|
|