Permit NumberFIR19-00101
StatusFinaled
Name THORPE FIRE SPRINKLER SYSTEMS
Site Address 2319 S TRAPPER PL
Project NameHARRIS RANCH NORTH LOT 21
Customer Number 
ePlanReviewYes
Description
TFSS TO INSTALL A NEW NFPA 13D FIRE SPRINKLER SYSTEM IN THIS NEW SINGLE FAMILY DWELLING.
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
INSP-Final Inspection8/8/20198/9/20198/9/2019APASS
DetailsJim Page
Previously noted items have been corrected, final fire sprinkler inspection complete.

Call James before heading out, thanks! Phone #: ###-#### Inspection requested via web by Anthony Minichiello
INSP-Final Inspection7/25/20197/25/20197/25/2019AFAIL
DetailsJim Page
Irrigation system is not complete, irrigation will need to be completed to test water flow shutdown to irrigation when flow switch activates during fire sprinkler water flow.

Call James before heading out. Thanks! Phone #: ###-#### Inspection requested via web by Anthony Minichiello
INSP-Sprinkler Rough-in/Hydro5/3/20195/3/20195/3/2019PPASS
DetailsTroy Cobbley
Corrections made. Tenting passed. Piping can be covered.

As Built Plans approved. Call James to coordinate Phone #: ###-#### Inspection requested via web by Anthony Minichiello
Plan assigned to (Stumbaugh)5/2/2019 5/3/2019 DONE
DetailsMark Stumbaugh
PLANS/APPL TAKEN TO FRONT DESK  5/3/2019 PASS
DetailsMark Stumbaugh
As Built Drawings - No Fee
Permit Ready to Issue  5/3/2019 DONE
CHANGE STATUS TO (ISS)  5/3/2019 DONE
as built
INSP-Sprinkler Rough-in/Hydro5/1/20195/2/20195/2/2019PFAIL
DetailsTroy Cobbley
Provide missing sprinkler head in bay window of master bedroom or provide exception, sprinkler heads are overspaced from the ceiling transition edge in the Kitchen area, provide sprinkler coverage under the second floor walkway as discussed, fix tenting as discussed. See the city approved plans for locations. Also the hydro test failed due to visible loss of pressure on the guage.
Plan resubmittals received  5/2/2019 DONE
Per Alicia requested for the eplan workflow to be reopened for an as built
Issue and Print Permit  2/22/2019 DONE
Application received  2/11/2019 DONE
Application submitted via PDS Online on Feb 11 2019 10:44AM
Intake Approval  2/11/2019 PASS
DetailsMark Stumbaugh
Plan assigned to (Stumbaugh)2/11/2019 2/11/2019 DONE
DetailsMark Stumbaugh
Sprinkler Plan Check2/11/2019 2/11/2019 PASS
DetailsMark Stumbaugh
Approved as noted
PLANS/APPL TAKEN TO FRONT DESK  2/11/2019 DONE
DetailsMark Stumbaugh
Permit Ready to Issue  2/11/2019 DONE